SANTA CRUZ DE TENERIFE, 9th April. (EUROPA PRESS) –
Tenerife’s Cabildo, under the direction of the Highways department, will commence installation work on the first section of the Padre Anchieta Pedestrian Walkway this Wednesday.
The project will be carried out during the night, from 10:00 p.m. until 6:00 a.m. on Thursday morning.
As a result of the construction, access to the roundabout from TF-5 towards Santa Cruz will be temporarily closed, along with access to the roundabout from TF-24 and Avenida del Astrofísico Francisco Sánchez.
Consequently, the only entry point to the roundabout will be through the TF-5 access, heading north, solely to reach the exit leading to Trinidad Avenue, as informed by the Cabildo.
In light of these developments, alternative routes will be available through exit 8B of the TF-5, Mayber Street, Camino San Miguel de Geneto, Domingo González Pérez Street, and TF-265.
The Cabildo de Tenerife urges drivers passing through the area during the module installation period to exercise caution and adhere to the instructions provided by Highway Operators.