Due to the carrying out of tests contemplated within the project of rehabilitation ofl Castle of San Andrés and its surroundings, tomorrow a section of the Maritime avenue of San Andrés. The cut-off will take place between 8:00 a.m. and 5:00 p.m., and during working time there will be signals and traffic lights for the proper functioning of the traffic.
As indicated from the Santa Cruz Town HallThese works correspond to the realization of field studies, specifically a geotechnical analysis, in which tastings and measurements will be carried out in the surroundings of Castillo de San Andrés.
The winning project of the ideas competition to value the Torres de San Andrés proposes the installation of a low-height platform as an element of the room, which will allow to contemplate the Castle, as well as an interpretation center that evokes the geometric figures recreating the forms and dimensions of the original rooms of the Castle. All this, accompanied by wooded vegetation and elements of energy sufficiency and sustainable water management.