Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home El Dia

Electric Recharge Station Approved Despite Negative Feedback in Arafo

May 18, 2025
in El Dia
Reading Time: 3 mins read
0
Electric Recharge Station Approved Despite Negative Feedback in Arafo
4
SHARES
Share on FacebookShare on Twitter

Electric Recharge Station Approved Despite Negative Feedback in Arafo

The Cabildo has validated its project for installing vehicle charging stations in the Valle de Güímar Industrial Polygon, despite the negative technical report from the Arafo City Council. The Insular Government Council resolved this disagreement “considering the public interest it serves,” taking into account the decision of the Territorial Planning Administrative Service.

Initiated by the Cabildo through the Insular Ministry of Industry, Commerce, Primary Sector, and Animal Welfare, this initiative involves the installation of four charging stations for electric vehicles in the car park adjacent to block C of the Güímar Valley Industrial Polygon, located in the municipality of Arafo, next to the La Rotonda café. The plan also includes a transformation station near the parking area, which will supply electric power to the charging points. This initiative is part of the collaboration agreement signed on 10 July 2024 between the Insular Cabildo and the municipalities of Candelaria, Arafo, and Güímar to execute an immediate action programme within the polygon.

The Arafo City Council issued a mandatory technical report stating that the project is situated on urban land designated for infrastructure, specifically for roadway. There, it will be part of the transformation centre and some underground conduits. Additionally, these conduits and charging points also impact urban land intended for civic-commercial buildings.

Concerning the transformation centre, a structure measuring 6.08 metres in length and 2.38 metres in depth, with a height exceeding 2.58 metres, results in a built area of 14.47 square metres. The General Planning Plan of Arafo specifies that “no apparent building action will be permitted.” Given that it does not conform to the regulations outlined in the PGO, the technical report concludes that “the section of the transformation centre situated in the infrastructure zone is not authorisable.”

Additionally, another part of this facility “is located in an area free of building regulations.” Furthermore, the garden and parking area in front of the west facade of existing buildings adjacent to the road alignments “are privately owned, which means the promoter must obtain the requisite permission for their use.”

A particularly significant point in the negative report from the City of Arafo notes that two roads in the Industrial Polygon Valle de Güímar are affected, stating that “the establishment of the proposed transformation centre is not authorised, as it is incompatible with the applicable urban planning regulations.”

To Amend the Planning

The Technical Territorial Planning Service counters the argument presented by the Arafo Council, confirming that municipal planning must adapt to new realities. It asserts that “the implementation of the project serves unquestionable public interest” and that “to achieve its goals, the action must be situated in the proposed location, which entails contravening the urban planning provisions of Arafo, with no other viable alternatives.” The transformation centre is slated for a small residual area south of the parking lot, situated between that area, block C, and the road bordering it. According to the island service’s report, this space, in the established reality, does not belong to the block but to the public land comprising the road and car park.

The Cabildo de Tenerife maintains that this project constitutes public works and, as such, does not require a licence or prior notification for its construction, building, or land use.

The City of Arafo has the option to file an administrative contentious appeal against this Insular Governing Council.

Related Posts

The Magician’s Dance Brings Together 12,000 People Around 700 Tables
El Dia

The Magician’s Dance Brings Together 12,000 People Around 700 Tables

July 12, 2025
SAN FERMINES TENERIFE | A neighbourhood in Tenerife kicks off the ‘txupinazo’ and celebrates its own bull run for San Fermín
El Dia

SAN FERMINES TENERIFE | A neighbourhood in Tenerife kicks off the ‘txupinazo’ and celebrates its own bull run for San Fermín

July 11, 2025
Fepeco and Güímar Explore Solutions for Public Housing
El Dia

Fepeco and Güímar Explore Solutions for Public Housing

July 11, 2025

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *


No Result
View All Result

Click Image to Join Community

Tenerife Forum Community

Previous News

They ratify the disqualification for 14 years to the former mayor of El Tanque

They ratify the disqualification for 14 years to the former mayor of El Tanque

3 years ago
A unique energy community in the Canary Islands in Adeje

A unique energy community in the Canary Islands in Adeje

3 years ago
A man arrested in Tenerife in an international macro-operation against pedophiles on the internet

A man arrested in Tenerife in an international macro-operation against pedophiles on the internet

3 years ago
Migratory birds, affected by the plastics that flood a pond from the landfill

Migratory birds, affected by the plastics that flood a pond from the landfill

3 years ago
Involcan detects the injection of 11 million cubic meters of magma into the Cumbre Vieja volcano

Involcan detects the injection of 11 million cubic meters of magma into the Cumbre Vieja volcano

4 years ago
Matheus, in 93′, gives Lanzarote air against a candidate for promotion, Tenerife B

Matheus, in 93′, gives Lanzarote air against a candidate for promotion, Tenerife B

3 years ago
No Result
View All Result

News Highlights

A Estate, a Saint, and a Pilgrimage (Part III). By Julio Torres Santos

No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife

A union denounces the alteration of customs officers’ shifts as malpractice.

The Convent of Santo Domingo Opens Its Doors to the ‘Spaces of the Canaries’

The Mediator Judge will send the solar panel case to the Court for a Jury.

A man in critical condition after being revived from a cardiac arrest in Candelaria.

Trending News

Canaries loses its traditional pubs
Atlantico

Canaries loses its traditional pubs

by Admin
July 12, 2025
0

Costly burdens, a lack of generational succession and transformations in social habits are driving traditional bars in...

The Cabildo to Provide Work Placements for 450 ULL Students in the 2025-2026 Academic Year

The Cabildo to Provide Work Placements for 450 ULL Students in the 2025-2026 Academic Year

July 12, 2025
The Magician’s Dance Brings Together 12,000 People Around 700 Tables

The Magician’s Dance Brings Together 12,000 People Around 700 Tables

July 12, 2025
A Estate, a Saint, and a Pilgrimage (Part III). By Julio Torres Santos

A Estate, a Saint, and a Pilgrimage (Part III). By Julio Torres Santos

July 12, 2025
No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife

No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife

July 11, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Guide
  • Adobe
  • Linkedin
  • Privacy Policy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly