Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home El Dia

3.7 million euros to improve the TF-12 between Santa Cruz and La Laguna through Anaga

September 7, 2023
in El Dia
Reading Time: 2 mins read
0
3.7 million euros to improve the TF-12 between Santa Cruz and La Laguna through Anaga
4
SHARES
Share on FacebookShare on Twitter



3.7 million euros to improve the TF-12 between Santa Cruz and La Laguna through Anaga

The Cabildo of Tenerife invests 3.7 million euros in the improvement works of the TF-12 highway that connects the municipalities of Santa Cruz and La Laguna through the Anaga ridge. The Minister of Highways, Dámaso Arteaga, explains that the work responds to “the need to provide greater security measures to a road that runs through the Biosphere Reserve” and that is “used by many residents of the area and by a large number of tourists from the Bailadero crossing to Las Canteras.”

The work will consist of the rehabilitation of the pavement, new signage and beacons, as well as the replacement and adaptation of drainage where necessary, in addition to the maintenance of services during the execution of the works. The deadline for completing the works is 12 months once they have started.

Thus the works will be carried out in various sections. First of all, the road surface will be improved between the area of ​​El Bailadero and Cruz del Carmen between kilometer points 9+460 to 22+676. Similarly, intervention will be carried out in the urban section between Las Mercedes and Las Canteras between kilometer points 26+233 to 28+670.

In addition, the work will not only consist of the rehabilitation of the road surface, but other tasks are contemplated such as the specific repair of the clay area in Las Mercedes, between point 28+255 to 28+300; the repair of a sunken ditch in Casa de la Cumbre located between kilometer point 16+290 to 17+000 and the landscape integration treatment in Cruz del Carmen that covers from point 22+598 to 22+676.



Source link

Related Posts

PSOE TENERIFE | PSOE proposes declaring an emergency due to ineffectiveness in the Cabildo of Tenerife and opposes the forestry penny.
El Dia

PSOE TENERIFE | PSOE proposes declaring an emergency due to ineffectiveness in the Cabildo of Tenerife and opposes the forestry penny.

July 17, 2025
Endured 12 Hours of Assaults and Feared Her Ex-Boyfriend Would Kill Her
El Dia

Endured 12 Hours of Assaults and Feared Her Ex-Boyfriend Would Kill Her

July 17, 2025
TLP Events 2025 | TLP Tenerife 2025 revs up with a motorbike route
El Dia

TLP Events 2025 | TLP Tenerife 2025 revs up with a motorbike route

July 16, 2025
No Result
View All Result

Click Image to Join Community

Tenerife Forum Community

Previous News

A four-year-old boy is in serious condition after drowning in the pool of a hotel in Adeje (Tenerife)

A four-year-old boy is in serious condition after drowning in the pool of a hotel in Adeje (Tenerife)

2 years ago
Canary Islands annuls the rule that allowed hunting dogs, cats and ferrets

Canary Islands annuls the rule that allowed hunting dogs, cats and ferrets

2 years ago
Reverses the deformation and elevation of the area closest to the eruptive centers of the volcano

Reverses the deformation and elevation of the area closest to the eruptive centers of the volcano

4 years ago
“I come to the Cabildo to work and put this island in its rightful place in the Canary Islands”

“I come to the Cabildo to work and put this island in its rightful place in the Canary Islands”

3 years ago
Mercadona starts the Spanish citrus campaign with the ‘Oronules’ mandarin

Mercadona starts the Spanish citrus campaign with the ‘Oronules’ mandarin

3 years ago
The boards slide down the slopes of Icod de los Vinos again

The boards slide down the slopes of Icod de los Vinos again

4 years ago
No Result
View All Result

News Highlights

The Leal Theatre presents a musical journey for all audiences this weekend.

Unions announce new meetings to resolve the employment dispute at the Tenerife Metropolitano.

Santa Cruz closes the Las Mesas park due to wildfire risk.

A Santa Cruz resident films a group of youths engaged in vandalism: “They’re wrecking the area and shouting.”

The City of Justice in Santa Cruz won’t be ready “in two, four, or even five years.”

Over 500 residents of Laguna enjoy summer activities organised by Citizen Participation

Trending News

Our Lady of Mount Carmel (and III)
La Laguna

Our Lady of Mount Carmel (and III)

by Admin
July 18, 2025
0

Explanation of the Promise: Many Popes, saints, and Catholic theologians have explained that, according to this promise,...

The tram strike committee resumes negotiations with Metropolitano de Tenerife.

The tram strike committee resumes negotiations with Metropolitano de Tenerife.

July 18, 2025
Sardà and Valdano Reflect on Maturity in a CaixaBank Discussion in Tenerife

Sardà and Valdano Reflect on Maturity in a CaixaBank Discussion in Tenerife

July 17, 2025
The Leal Theatre presents a musical journey for all audiences this weekend.

The Leal Theatre presents a musical journey for all audiences this weekend.

July 17, 2025
Unions announce new meetings to resolve the employment dispute at the Tenerife Metropolitano.

Unions announce new meetings to resolve the employment dispute at the Tenerife Metropolitano.

July 17, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Guide
  • Adobe
  • Linkedin
  • Privacy Policy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly