Tuesday, September 16, 2025
Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home Europa Press

The Cabildo de Tenerife approves the tender file for the works of the motor circuit for 56 million

March 28, 2023
in Europa Press
Reading Time: 3 mins read
0
The Cabildo de Tenerife approves the tender file for the works of the motor circuit for 56 million
3
SHARES
Share on FacebookShare on Twitter



The president, Pedro Martín, points out that it is “a great step forward” and anticipates that the work will begin this year

SANTA CRUZ DE TENERIFE, March 28 (EUROPA PRESS) –

The Governing Council of the Cabildo de Tenerife has approved this Tuesday the file for the contracting of the works of the ‘Tenerife Circuito del Motor’, in the municipality of Granadilla de Abona.

The construction of this automobile infrastructure will have a bidding budget of 56 million euros and an execution period of 40 months.

The insular president, Pedro Martín, pointed out in a note that “it is a great step forward, a tender that will allow companies to present themselves now to carry out these works, with which this year machinery can be seen working.”

Likewise, he said that “it is important that when talking about the Motor Circuit it is no longer just a matter of addressing ideas, possible projects or talking about the future, steps must be taken in this long process, with many administrative procedures, in order to comply with all the regulations”.

Pedro Martín indicated that the tender includes the execution of three projects: the canalization of the three ravines with the defense plan against floods, the earthworks and installations for removable stands and, finally, the speed track.

For his part, the First Vice President and Island Councilor for Highways, Enrique Arriaga, assures that “there are many difficulties that have arisen along the way” and for this reason they are “very happy” because in a few months they will be able to start the works of this infrastructure “so demanded by the thousands of motor enthusiasts on the island”.

Arriaga points out that “the circuit will have an area of ​​about 650,000 square meters that will allow all kinds of competitions to be held with quality and, above all, safety” and recalls that it has the approvals of the International Automobile Federation and the Federation Motorcycle International to host top-level races.

“This space will not be exclusively for large events, our goal is for the motor world to continue to grow in Tenerife. For this, the Circuit will have facilities dedicated to training around motorsport and there will also be plots where related companies can set up with this sector to test components, competition materials, assembly of parts and repair, which will become a new employment niche in the southern part of the island”, affirms the vice-president.

FOUR KILOMETERS OF LAYOUT

Once the works are finished, the Motor Circuit will have a layout of 4,050 meters, with a main straight of about 800 meters long and a series of secondary straights designed to facilitate overtaking, especially in the case of cars, with various ramps that will be a spectacle for the motorcycles.

In addition, it will be characterized by being one of the few circuits in the world to circulate in an anti-clockwise direction.

The layout is developed with a total of 16 curves in plan, of which there will be 11 to the left and 5 to the right.

All of them will have different base radii starting from a minimum of 21 meters to a maximum of 100 meters and transversely, the curves will have a single slope that varies between 1% and 5% depending on the radius and speed of movement.

All this will be complemented by a 72,000 square meter paddock prepared to accommodate all the needs required by any national or international competition, with 15 boxes for cars and 45 for motorcycles.

The infrastructure will also have a grandstand with capacity for more than 5,000 people, a restaurant and a shopping area.



Source link

Related Posts

Canary Islands and Euskadi Forge Alliance Advocating “Practical Politics” Against National “Polarisation”
Europa Press

Canary Islands and Euskadi Forge Alliance Advocating “Practical Politics” Against National “Polarisation”

September 11, 2025
Clavijo and Pradales to Sign Bilateral R&D Agreement in the Canaries this Thursday
Europa Press

Clavijo and Pradales to Sign Bilateral R&D Agreement in the Canaries this Thursday

September 11, 2025
Clavijo and Pradales Sign Bilateral R&D Agreement in the Canary Islands This Thursday
Europa Press

Clavijo and Pradales Sign Bilateral R&D Agreement in the Canary Islands This Thursday

September 10, 2025
No Result
View All Result

Latest Blog Articles

  • Blog
Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

1 day ago
El Médano: A Hidden Gem for Windsurfing Enthusiasts

El Médano: A Hidden Gem for Windsurfing Enthusiasts

4 days ago
Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

4 days ago
Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

4 days ago
Sun, Sand, and Serenity: Your Guide to Los Cristianos Beach

Sun, Sand, and Serenity: Your Guide to Los Cristianos Beach

1 week ago
Tenerife’s Hidden Gems: The Enchantment of Black Sand Beaches

Tenerife’s Hidden Gems: The Enchantment of Black Sand Beaches

1 week ago
No Result
View All Result

News Highlights

Approval Granted for the Construction of Two Small Power Stations to Prevent Blackouts in Tenerife

25th Anniversary of “La Laguna World Heritage”: Celebrations of Christ and St. Michael

Photographs and Chorus of Summer Songs (LVII)

Emergency in Tenerife: Firefighters Rescue Child Trapped in Car

Tenerife Cabildo Bans Open Fires in Forests and Advises Against Using Trails

Drago Gran Canaria on the Eviction of a Family with Six Minors: “Effective Measures Against Homelessness Are Not Being Implemented”

Trending News

Tragedy on a Canary Island Beach: Death Occurs Despite Rescue Efforts
Diario de Avisos

Tragedy on a Canary Island Beach: Death Occurs Despite Rescue Efforts

by Admin
September 16, 2025
0

A man in his fifties has died after being rescued from the sea with signs of drowning...

Nearly 80 Participants Engage in Initial Training Sessions of the Geological Risk Conference

Nearly 80 Participants Engage in Initial Training Sessions of the Geological Risk Conference

September 16, 2025
Families can now apply for the regional childcare voucher.

Families can now apply for the regional childcare voucher.

September 16, 2025
Approval Granted for the Construction of Two Small Power Stations to Prevent Blackouts in Tenerife

Approval Granted for the Construction of Two Small Power Stations to Prevent Blackouts in Tenerife

September 16, 2025
25th Anniversary of “La Laguna World Heritage”: Celebrations of Christ and St. Michael

25th Anniversary of “La Laguna World Heritage”: Celebrations of Christ and St. Michael

September 16, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Canarian News
  • Privacy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly