Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home El Dia

Approval granted for the new pool and sports complex

June 4, 2025
in El Dia
Reading Time: 3 mins read
0
Approval granted for the new pool and sports complex
3
SHARES
Share on FacebookShare on Twitter



Los Realejos

Approval for New Pool and Sports Complex

The bidding for the project will take place in the coming weeks v The construction of this facility will cost 8.2 million euros

Approval granted for the new pool and sports complex

Moment when the Council approves the required planning modification. | EL DÍA

El Día

Los Realejos04 JUN 2025 8:00

The Los Realejos Council unanimously approved a partial modification of the General Planning Plan related to the uses of the plot where the town hall plans to build the municipal pool and sports complex. This procedure, driven by the Municipal Urban Planning Management, is the necessary step to tender the execution of this much-needed infrastructure for 8,195,562 euros.

The first phase will consist of building the new pool with three tanks for training, rehabilitation or therapeutic, and initiation. Once this phase is completed, the current aquatic activity will move to this part of the new infrastructure, converting the current pool into the dry sports area of the complex, which will house a gym and training rooms, cafeteria, other multipurpose uses, and complementary services.

The mayor of Los Realejos, Adolfo González, thanked the Cabildo of Tenerife for “understanding the priority of this project and its contribution to the economic effort to develop it, as well as all the municipal technical staff involved in each previous step to undertake such a large infrastructure.” In this regard, he recalled that it has required urban planning studies, economic feasibility, uses, basic project, drafting of the final project, complementary geotechnical studies, and the partial planning modification. The mayor pointed out “intense negotiations with the mentioned island administration or those we are trying to reach with the Government of the Canary Islands” in order to start the work “in the second semester” of this year.

About the current plot

The councilor of Urban Planning, Noelia González, argued that the execution of the new pool and sports complex “has been projected over the entire surface of the plot located behind the current pool,” which required the specific modification of the PGO approved by the Council. “It is there where the first phase of construction work would start, as well as on the current infrastructure’s surface, which is where the second phase will take place.”

The basic project for the new pool and sports complex of Los Realejos was drafted by 2RAEstudio Engineering and Architecture led by the architect Pablo Cionfrini-Lezzi, while the execution project was drafted by the UTE Realejos Bonilla González of architects José María González Ibáñez and Germán Bonilla Montijano. n

TOPICS

Related Posts

The Majorero Donkey Endures the Heat to Succeed in Aguere
El Dia

The Majorero Donkey Endures the Heat to Succeed in Aguere

July 18, 2025
PSOE TENERIFE | PSOE proposes declaring an emergency due to ineffectiveness in the Cabildo of Tenerife and opposes the forestry penny.
El Dia

PSOE TENERIFE | PSOE proposes declaring an emergency due to ineffectiveness in the Cabildo of Tenerife and opposes the forestry penny.

July 17, 2025
Endured 12 Hours of Assaults and Feared Her Ex-Boyfriend Would Kill Her
El Dia

Endured 12 Hours of Assaults and Feared Her Ex-Boyfriend Would Kill Her

July 17, 2025

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *


No Result
View All Result

Click Image to Join Community

Tenerife Forum Community

Previous News

The Arona citizen service offices open in the afternoon from this week

The Arona citizen service offices open in the afternoon from this week

3 years ago
UD Las Palmas – Tenerife: Everyone to Gran Canaria!

UD Las Palmas – Tenerife: Everyone to Gran Canaria!

3 years ago
Laguna City Council: A Race Against Time

Laguna City Council: A Race Against Time

3 months ago
Discover the Eco-Tax Prices Implemented in Tenerife

Discover the Eco-Tax Prices Implemented in Tenerife

1 year ago
They arrest a man for cheating about 13,000 euros in Tenerife

They arrest a man for cheating about 13,000 euros in Tenerife

4 years ago
Celebrating 2025: Two Unforgettable Family-Friendly Parties

Celebrating 2025: Two Unforgettable Family-Friendly Parties

7 months ago
No Result
View All Result

News Highlights

The Majorero Donkey Endures the Heat to Succeed in Aguere

Our Lady of Mount Carmel (and III)

The tram strike committee resumes negotiations with Metropolitano de Tenerife.

Sardà and Valdano Reflect on Maturity in a CaixaBank Discussion in Tenerife

The Leal Theatre presents a musical journey for all audiences this weekend.

Unions announce new meetings to resolve the employment dispute at the Tenerife Metropolitano.

Trending News

The Canary Sports Observatory: Rigorous and Accessible Data for Informed Decision-Making
Atlantico

The Canary Sports Observatory: Rigorous and Accessible Data for Informed Decision-Making

by Admin
July 18, 2025
0

Sport management in the Canary Islands is gearing up for a significant leap. This is not just...

The giant Zamna reveals its lineup of artists for the upcoming launch in Tenerife.

The giant Zamna reveals its lineup of artists for the upcoming launch in Tenerife.

July 18, 2025
Can La Palma Have Its First Geothermal Power Station? Here Are the Areas Being Investigated

Can La Palma Have Its First Geothermal Power Station? Here Are the Areas Being Investigated

July 18, 2025
The Majorero Donkey Endures the Heat to Succeed in Aguere

The Majorero Donkey Endures the Heat to Succeed in Aguere

July 18, 2025
Our Lady of Mount Carmel (and III)

Our Lady of Mount Carmel (and III)

July 18, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Guide
  • Adobe
  • Linkedin
  • Privacy Policy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly