Over 200 inhabitants of Güímar and Fasnia took part in a meeting where they established the groundwork for actions aimed at preventing the establishment of the El Pilón I and II wind farms. These projects are expected to generate 23.5 megawatts through the installation of six wind turbines and 27 towers for energy transmission to the Valle de Güímar industrial estate.