Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home Europa Press

Tenerife’s Cabildo to Wrap Up Operations by March End

February 21, 2025
in Europa Press
Reading Time: 2 mins read
0
Tenerife’s Cabildo to Wrap Up Operations by March End
3
SHARES
Share on FacebookShare on Twitter

Santa Cruz de Tenerife 21 Feb. (Europa Press) –

The Cabildo de Tenerife, via the roads department, will conclude the improvements to the channel of the ravine of the shepherds as it intersects with the TF-31, in the Martiánez district of Puerto de la Cruz, by the end of March.

The Roads Minister, Dámaso Arteaga, clarifies in a statement that these works, entailing an expenditure of 600,000 euros, have been impacted by the severe rainfall in recent months which resulted in delays in the project.

Arteaga specifically emphasises, “we acknowledge that, whenever there are heavy rainfalls, the road endures the effects akin to a waterfall caused by the runoff along with stones and various sediments from the ravine of the shepherds, creating a hazardous environment for the 20,000 to 25,000 vehicles and pedestrians that pass through depending on the specific section and season of the year.”

Moreover, Arteaga mentions that the project involves “constructing a reinforced concrete framework so that the water can flow over the road and the adjacent pedestrian walkway, thereby preventing damage to the roadway.”

The minister further remarked that “these works are somewhat complex and necessitate the closure of the access road from Martiánez to ensure public safety.”

This entails a diversion of traffic, he noted, prompting the Cabildo to urge all drivers to remain vigilant regarding the signs and guidance provided by road personnel until the project is completed.”

The construction commenced with the installation of 24 micropiles, followed by the fabrication of the frame, which will be entirely constructed from reinforced concrete.

Consequently, it will comprise a depth of 1 meter throughout the entirety of the structure supported by two retaining walls.

The inner wall (mountain side) will reach a height of 8.5 meters with a thickness of 80 centimetres, whereas the outer wall (sea side) will measure 6.5 metres in height with a thickness of 60 centimetres. Both walls will be embedded one metre below the current surface level.

In addition, the roof slab will have a thickness of 80 centimetres and a drainage channel will be created for water flow, featuring a clear width of 8.10 metres and a height of 1.5 metres.

The integration of the channel with the terrain will be accomplished by respecting and adapting to the existing topography of the slope, after it has been cleared.

Following the completion of the essential work for the channelisation of the ravine, the asphalt pavement and horizontal markings will be reinstated prior to reopening the route to traffic.

Related Posts

Seized a yacht with cocaine about 50 miles south of the Canaries, recovering 25 kilograms of the drug.
Europa Press

Seized a yacht with cocaine about 50 miles south of the Canaries, recovering 25 kilograms of the drug.

July 7, 2025
Clavijo Brands it “Indecent” for Regions Not to Aid Young Migrants; Warns of Potential Prosecutor Involvement
Europa Press

Clavijo Brands it “Indecent” for Regions Not to Aid Young Migrants; Warns of Potential Prosecutor Involvement

June 26, 2025
Torres Shifts Responsibility for Material Purchases to SCS and Assures No Recordings of His Wrongdoing Will Emerge
Europa Press

Torres Shifts Responsibility for Material Purchases to SCS and Assures No Recordings of His Wrongdoing Will Emerge

June 23, 2025
No Result
View All Result

Click Image to Join Community

Tenerife Forum Community

Previous News

The Zarzuela Season offers its final gala in Gran Canaria and Tenerife

The Zarzuela Season offers its final gala in Gran Canaria and Tenerife

4 years ago
Titsa Services Adjust Due to Weekend Time Change

Titsa Services Adjust Due to Weekend Time Change

9 months ago
Increased Strikes Planned by Tram Workers in Tenerife starting September

Increased Strikes Planned by Tram Workers in Tenerife starting September

1 year ago
The dismissal of the manager of a pharmacy in Tenerife who tripled his salary was declared admissible

The dismissal of the manager of a pharmacy in Tenerife who tripled his salary was declared admissible

2 years ago
Traffic Changes Ahead: Padre Anchieta Roundabout Upgrades in Tenerife

Traffic Changes Ahead: Padre Anchieta Roundabout Upgrades in Tenerife

10 months ago
Tamara Raya Set to Take Over as PSOE Secretary in Tenerife, Eyes 2027 Cabildo Leadership

Tamara Raya Set to Take Over as PSOE Secretary in Tenerife, Eyes 2027 Cabildo Leadership

6 months ago
No Result
View All Result

News Highlights

Our Lady of Mount Carmel (and III)

The tram strike committee resumes negotiations with Metropolitano de Tenerife.

Sardà and Valdano Reflect on Maturity in a CaixaBank Discussion in Tenerife

The Leal Theatre presents a musical journey for all audiences this weekend.

Unions announce new meetings to resolve the employment dispute at the Tenerife Metropolitano.

Santa Cruz closes the Las Mesas park due to wildfire risk.

Trending News

The giant Zamna reveals its lineup of artists for the upcoming launch in Tenerife.
La Laguna

The giant Zamna reveals its lineup of artists for the upcoming launch in Tenerife.

by Admin
July 18, 2025
0

The international electronic music brand, one of the most prestigious in the world, will debut on the...

Can La Palma Have Its First Geothermal Power Station? Here Are the Areas Being Investigated

Can La Palma Have Its First Geothermal Power Station? Here Are the Areas Being Investigated

July 18, 2025
The Majorero Donkey Endures the Heat to Succeed in Aguere

The Majorero Donkey Endures the Heat to Succeed in Aguere

July 18, 2025
Our Lady of Mount Carmel (and III)

Our Lady of Mount Carmel (and III)

July 18, 2025
The tram strike committee resumes negotiations with Metropolitano de Tenerife.

The tram strike committee resumes negotiations with Metropolitano de Tenerife.

July 18, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Guide
  • Adobe
  • Linkedin
  • Privacy Policy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly