Thursday, September 18, 2025
Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home Diario de Avisos

Tenerife’s Key Projects Delayed by Over Three Years: What to Expect

November 25, 2024
in Diario de Avisos
Reading Time: 3 mins read
0
Tenerife’s Key Projects Delayed by Over Three Years: What to Expect
5
SHARES
Share on FacebookShare on Twitter

 

The two significant construction projects vital for addressing the severe mobility challenges that Tenerife has endured for decades—the Las Chafiras-Oroteanda connections and the Erjos tunnel—are projected to be completed later than anticipated, according to the latest estimates from the Government of the Canary Islands. The San Miguel de Abona infrastructure is expected to be delayed by four years, while the road under the Teno massif, linking the north and south of the island, faces a delay of three years and four months. This timeline is far removed from the original deadlines set when the projects were awarded to construction firms via public tenders.

Specifically, for the dual Erjos tunnel, which has the largest budget within the highway agreement (a total of 241 million euros, with an additional 22.2 million euros due to price adjustments), the timeframe for completion was established at 48 months from the beginning of earthworks on November 25, 2019 (two weeks prior to the signing of the staking document). If the latest update from the Government of the Canary Islands is adhered to, the project will now take 88 months, pushing back the expected opening for vehicle access until March 2027. This reflects a delay of three years and four months.

An even longer delay is anticipated for the other significant project in the southern area, the Las Chafiras and Oroteanda connections (with the latter already operational), which are part of the third lane of the TF-1 motorway between San Isidro and Playa de Las Américas. The approval for the start of construction was granted on November 26, 2018, with a projected completion period of 30 months, meaning it should have wrapped up by May 2021. Should the revised deadline established by the Department of Public Works be met, the project is now expected to finish in May 2025. Hence, the total time required for its completion will be 78 months, resulting in a delay of four years.

Numerous factors have contributed to the slow progress of the two routes. Regarding the dual Erjos tunnel, which spans over 5 kilometres, elements such as the pandemic, two price reviews, and notably, a ruling by the Superior Court of Justice of the Canary Islands have had an impact. This ruling, issued in March this year, annulled the awarding of this mega-project to the Temporary Union of Companies FCC Construction, Syocsa-Inarsa, and El Silbo. Given the advanced stage of work, the Government of the Canary Islands had to negotiate compensation, amounting to 13.7 million euros, to the consortium of OHL, Excavaciones Bahíllo, and Asfaltos Bahíllo, which, according to the court’s resolution, should not have been excluded from the public tender after being the initial winner.

For the Las Chafiras and Oroteanda roundabouts, awarded for nearly 22 million euros to the joint venture of Ferrovial Agroman, Ten Asfaltos, and Excavaciones Óscar del Castillo, multiple factors, beyond the pandemic, have played a role. Notably, the unexpected discovery of a native beetle necessitated the manual removal of specimens, alongside challenges in relocating the medium voltage power line supplying Llano del Camel.

On November 13, the exit branch to Oroteanda was opened for traffic, rendering this link fully operational and allowing movement in both directions towards Playa de Las Américas and Santa Cruz.

The Oroteanda exit branch opened on the 13th, although work remains for some time. | D.A.

 

Related Posts

Suspected Arsonist Arrested in Southern Tenerife
Diario de Avisos

Suspected Arsonist Arrested in Southern Tenerife

September 18, 2025
From ‘False Cathedrals’ to Temples Attacked by Pirates
Diario de Avisos

From ‘False Cathedrals’ to Temples Attacked by Pirates

September 16, 2025
Tragedy on a Canary Island Beach: Death Occurs Despite Rescue Efforts
Diario de Avisos

Tragedy on a Canary Island Beach: Death Occurs Despite Rescue Efforts

September 16, 2025
No Result
View All Result

Latest Blog Articles

  • Blog
Dolphin Encounters in Tenerife: A Journey Through the Waves

Dolphin Encounters in Tenerife: A Journey Through the Waves

3 hours ago
Why Tenerife Could Be the Surprise Winner as American Tourism Takes a Hit

Why Tenerife Could Be the Surprise Winner as American Tourism Takes a Hit

4 hours ago
Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

3 days ago
El Médano: A Hidden Gem for Windsurfing Enthusiasts

El Médano: A Hidden Gem for Windsurfing Enthusiasts

6 days ago
Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

6 days ago
Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

6 days ago
No Result
View All Result

News Highlights

Dolphin Encounters in Tenerife: A Journey Through the Waves

Everything You Need to Know About the El Médano Barquera Pilgrimage: Events, Timings, and Buses

Why Tenerife Could Be the Surprise Winner as American Tourism Takes a Hit

Photographs and Verses from Those Summer Songs (LIX)

Tenerife Traffic Relief: New Bus Lane to Alleviate Congestion on Key Motorway

Residents of Cho Parque la Reina Join Nicolás Jorge’s Legal Challenge Against the Urban Development Plan

Trending News

Podemos Calls for Suspension of La Laguna-Tenerife-Bnei Herzliya Basketball Champions League Match
Europa Press

Podemos Calls for Suspension of La Laguna-Tenerife-Bnei Herzliya Basketball Champions League Match

by Admin
September 18, 2025
0

La secretaria general de Podemos en Canarias, Noemí Santana - PODEMOS Follow the latest live news on...

Environmental Groups to Call for Boycott of Meliá if They Purchase La Tejita Hotel

Environmental Groups to Call for Boycott of Meliá if They Purchase La Tejita Hotel

September 18, 2025
Suspected Arsonist Arrested in Southern Tenerife

Suspected Arsonist Arrested in Southern Tenerife

September 18, 2025
Dolphin Encounters in Tenerife: A Journey Through the Waves

Dolphin Encounters in Tenerife: A Journey Through the Waves

September 18, 2025
Everything You Need to Know About the El Médano Barquera Pilgrimage: Events, Timings, and Buses

Everything You Need to Know About the El Médano Barquera Pilgrimage: Events, Timings, and Buses

September 18, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Canarian News
  • Privacy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly