Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home Diario de Avisos

New Route Planned for Arenal Beach from TF-13

October 14, 2024
in Diario de Avisos
Reading Time: 3 mins read
0
New Route Planned for Arenal Beach from TF-13
3
SHARES
Share on FacebookShare on Twitter

Arenal beach, located in Bajamar, will soon feature a new access point from the TF-13 road, precisely from the central area above the beach, where there is a reinforced earth wall. This option was selected from the various alternatives assessed in a study conducted by technicians from La Laguna City Council and the Cabildo.

“Among the alternatives proposed by our technical team to improve accessibility to the beach, we have prioritised the option that ensures greater safety and can be utilized year-round, as it is not susceptible to variables such as the state of the sea,” stated the Councillor for Works and Infrastructure, Ángel Chinea.

“The next step involves drafting the project, followed by executing a task that presents some complexity due to the necessity to secure the slope; however, it will enable access and enjoyment of this distinctly beautiful beach on our coastline,” he added.

Historically, access to this beach has been via the El Lobo road adjacent to the former Neptuno hotel, which has been closed for security reasons for several years, and from the La Hoya area. To provide a safer access route, three new alternatives have been examined from the TF-13, including alternatives for access through El Lobo and La Hoya.

In evaluating the alternatives from the TF-13, their compatibility with the existing road structures has been considered, as well as the improvement works planned, for which discussions have occurred with the technicians from the Cabildo Highway Service. The necessary protective measures against landslides at the beach have also been factored in, which are consistent across all access alternatives, aside from minor variations.

Having reviewed the various options, the technicians ultimately dismissed access via the El Lobo road and from the La Hoya area, as both routes contain particularly problematic segments regarding landslides and are highly exposed to waves (thus during rough sea conditions, access may be hindered or users could find themselves stranded). The report from the city council, part of the joint study by both administrations, noted that the La Hoya option would also be considerably lengthy and subsequently more costly. Additionally, the El Lobo road has the complication of having its initial section owned privately.

Consequently, the technicians have chosen a new access from the TF-13, which, among its advantages, provides more direct access to the beach, is less vulnerable to storm surges, and incorporates measures for stabilisation and landslide protection that safeguard both the access and the beach itself, while also being shorter in distance. The only drawback is that this access is the steepest, and the final segment relies on materials prone to sliding, necessitating reinforcement of the terrain or structure to prevent damage.

In assessing this new access from the TF-13, three options have been analysed: from the northern end, the southern end, and the central section, with the latter ultimately selected. This access will lead to the central area of the beach, extending 195 metres with an average gradient of 22.5%. The report explains that the morphology and type of terrain for this option accommodate paths made of wood, stone, concrete, or mixed materials. Specifically, the estimated budget for this intervention stands at 850,169 euros for a cement path, or 868,341 euros should wood be chosen.

Now that this option has been selected, the next phase will involve the Council making the project drafting available for tender, as clarified by the Works and Infrastructure department. In a recent meeting between the Cabildo and the City Council regarding lagoon coast projects, the Island Corporation reaffirmed their commitment to include the Arenal beach project in Tenerife and the Sea’s financing programme for the forthcoming year.

Related Posts

No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife
Diario de Avisos

No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife

July 11, 2025
The Aemet forecasts the weather in the Canaries this Friday: particular focus on two phenomena
Diario de Avisos

The Aemet forecasts the weather in the Canaries this Friday: particular focus on two phenomena

July 11, 2025
The Big Deal Isn’t the Car
Diario de Avisos

The Big Deal Isn’t the Car

July 9, 2025
No Result
View All Result

Click Image to Join Community

Tenerife Forum Community

Previous News

A chestnut basket in eight steps

A chestnut basket in eight steps

2 years ago
The Canary Islands Parliament Initiates the Process of Renewing the Chamber’s Four Bodies

The Canary Islands Parliament Initiates the Process of Renewing the Chamber’s Four Bodies

1 year ago
The Canary Islands will receive 300,000 euros to exhume Francoist graves

The Canary Islands will receive 300,000 euros to exhume Francoist graves

1 year ago
The insular opposition agrees on Arico’s right to receive compensation

The insular opposition agrees on Arico’s right to receive compensation

4 years ago
Los Realejos invites you to go out ‘Pa’ la calle ‘to enjoy various events within the framework of the Christmas campaign

Los Realejos invites you to go out ‘Pa’ la calle ‘to enjoy various events within the framework of the Christmas campaign

4 years ago
An early harvest starts, uneven and with the threat of pests

An early harvest starts, uneven and with the threat of pests

4 years ago
No Result
View All Result

News Highlights

A Estate, a Saint, and a Pilgrimage (Part III). By Julio Torres Santos

No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife

A union denounces the alteration of customs officers’ shifts as malpractice.

The Convent of Santo Domingo Opens Its Doors to the ‘Spaces of the Canaries’

The Mediator Judge will send the solar panel case to the Court for a Jury.

A man in critical condition after being revived from a cardiac arrest in Candelaria.

Trending News

Canaries loses its traditional pubs
Atlantico

Canaries loses its traditional pubs

by Admin
July 12, 2025
0

Costly burdens, a lack of generational succession and transformations in social habits are driving traditional bars in...

The Cabildo to Provide Work Placements for 450 ULL Students in the 2025-2026 Academic Year

The Cabildo to Provide Work Placements for 450 ULL Students in the 2025-2026 Academic Year

July 12, 2025
The Magician’s Dance Brings Together 12,000 People Around 700 Tables

The Magician’s Dance Brings Together 12,000 People Around 700 Tables

July 12, 2025
A Estate, a Saint, and a Pilgrimage (Part III). By Julio Torres Santos

A Estate, a Saint, and a Pilgrimage (Part III). By Julio Torres Santos

July 12, 2025
No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife

No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife

July 11, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Guide
  • Adobe
  • Linkedin
  • Privacy Policy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly