Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home Europa Press

Installation Completed for the Fourth Section of the Padre Anchieta Walking Trail

September 25, 2024
in Europa Press
Reading Time: 2 mins read
0
Installation Completed for the Fourth Section of the Padre Anchieta Walking Trail
3
SHARES
Share on FacebookShare on Twitter

SANTA CRUZ DE TENERIFE, 25 Sep. (EUROPA PRESS) –

The Tenerife Island Council, via the Mobility department, has completed the installation of the fourth segment of the pathway that constitutes the Grand Insular Ring of Padre Anchieta. The operation was carried out yesterday afternoon, on Tuesday, employing two heavy-duty cranes for the assembly. In this context,

The president of the Cabildo, Rosa Dávila, has conveyed her delight at the progress of the project and notes that, as per forecasts, the installation of the fourth segment is expected to occur next week, while modules 6, 7, 8, and 9 are scheduled for installation in October. Following this, the structure of the ring will be concluded by the end of November with the installation of modules 10 and 11.

“The schedule for the works is being adhered to, and we anticipate completing the civil engineering works between April and May. It must be noted that this walkway will transform the landscape of Padre Anchieta and the city of La Laguna; an infrastructure with a design that received the National Innovation and Design Awards 2019, bestowed by the Ministry of Science, Innovation and Universities of Spain,” explained Dávila.

Additionally, he emphasised that the effect of this pedestrian ring on traffic congestion is “crucial in alleviating delays at one of the most critical points on the Northern Highway. During peak times, waiting durations will decrease by 50%, resulting in improved traffic flow and a significant time saving for our drivers.”

Meanwhile, the Councillor for Roads, Dámaso Arteaga, who has been overseeing the assembly operation, indicated that the installation has necessitated traffic adjustments due to the closure of the two lanes at the Padre Anchieta roundabout, which will persist until Friday from 8:30 p.m. to 6 a.m.

As a result of these closures, the following diversions will be implemented: access from TF-5 to TF-24 and Astrofísico Francisco Sánchez street via Lora y Tamayo – Mayber street – Camino San Miguel de Geneto – Domingo González Pérez street – TF-265 or El Coromoto and access to TF-5 heading north from Geneto and TF-24 via Avenida de La Trinidad.

The construction of the Grand Pedestrian Ring of Padre Anchieta involves eleven metal components weighing 40 tons each (totaling 1,500 tons) as well as three connecting ramps (North, Centre, and South), representing an investment of 8.8 million euros. The works, being carried out by Obras Huarte Lain SA, involve the assembly of the four segments that make up the north ramp, measuring 12.5 m in length and 1.85 m in free width. This ramp is supported by seven square-section metal piles, which have already been installed. The Cabildo de Tenerife urges drivers to remain cautious at all times.

Related Posts

Seized a yacht with cocaine about 50 miles south of the Canaries, recovering 25 kilograms of the drug.
Europa Press

Seized a yacht with cocaine about 50 miles south of the Canaries, recovering 25 kilograms of the drug.

July 7, 2025
Clavijo Brands it “Indecent” for Regions Not to Aid Young Migrants; Warns of Potential Prosecutor Involvement
Europa Press

Clavijo Brands it “Indecent” for Regions Not to Aid Young Migrants; Warns of Potential Prosecutor Involvement

June 26, 2025
Torres Shifts Responsibility for Material Purchases to SCS and Assures No Recordings of His Wrongdoing Will Emerge
Europa Press

Torres Shifts Responsibility for Material Purchases to SCS and Assures No Recordings of His Wrongdoing Will Emerge

June 23, 2025
No Result
View All Result

Click Image to Join Community

Tenerife Forum Community

Previous News

Acceptance Sets In as Araferos Turn to Drinking Water from the Tanks

Acceptance Sets In as Araferos Turn to Drinking Water from the Tanks

12 months ago
New York emerges inside the Fairgrounds on the stage of the 2023 Carnival

New York emerges inside the Fairgrounds on the stage of the 2023 Carnival

3 years ago
The two capitals of the Canary Islands, among the four Spanish cities with the most empty homes

The two capitals of the Canary Islands, among the four Spanish cities with the most empty homes

2 years ago
“When they see us cleaning, they thank us and touch our whistle”

“When they see us cleaning, they thank us and touch our whistle”

2 years ago
TENERIFE SOUTH AIRPORT QUEUES |  The Cabildo announces that it will declare the Tenerife South Airport a sensitive area

TENERIFE SOUTH AIRPORT QUEUES | The Cabildo announces that it will declare the Tenerife South Airport a sensitive area

2 years ago
Tenerife Cabildo Lifts Insular Emergency Plan Following Restoration of Phone Services

Tenerife Cabildo Lifts Insular Emergency Plan Following Restoration of Phone Services

3 months ago
No Result
View All Result

News Highlights

Our Lady of Mount Carmel (and III)

The tram strike committee resumes negotiations with Metropolitano de Tenerife.

Sardà and Valdano Reflect on Maturity in a CaixaBank Discussion in Tenerife

The Leal Theatre presents a musical journey for all audiences this weekend.

Unions announce new meetings to resolve the employment dispute at the Tenerife Metropolitano.

Santa Cruz closes the Las Mesas park due to wildfire risk.

Trending News

The giant Zamna reveals its lineup of artists for the upcoming launch in Tenerife.
La Laguna

The giant Zamna reveals its lineup of artists for the upcoming launch in Tenerife.

by Admin
July 18, 2025
0

The international electronic music brand, one of the most prestigious in the world, will debut on the...

Can La Palma Have Its First Geothermal Power Station? Here Are the Areas Being Investigated

Can La Palma Have Its First Geothermal Power Station? Here Are the Areas Being Investigated

July 18, 2025
The Majorero Donkey Endures the Heat to Succeed in Aguere

The Majorero Donkey Endures the Heat to Succeed in Aguere

July 18, 2025
Our Lady of Mount Carmel (and III)

Our Lady of Mount Carmel (and III)

July 18, 2025
The tram strike committee resumes negotiations with Metropolitano de Tenerife.

The tram strike committee resumes negotiations with Metropolitano de Tenerife.

July 18, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Guide
  • Adobe
  • Linkedin
  • Privacy Policy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly