Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home Diario de Avisos

The Teide Cable Car: A One-of-a-Kind Experience in the World

September 24, 2024
in Diario de Avisos
Reading Time: 3 mins read
0
The Teide Cable Car: A One-of-a-Kind Experience in the World
3
SHARES
Share on FacebookShare on Twitter

This Tuesday, the Teide Cable Car introduced a new propulsion system for its cabins at the Cañadas del Teide National Park, powered entirely by photovoltaic solar energy, consequently achieving a reduction of CO2 emissions to zero.

As a result, the Teide Cable Car now stands as the first global example of an isolated system that operates on solar energy without being connected to the electrical grid.

The introduction of this system signifies a complete reduction in the carbon footprint of this infrastructure, further establishing the island of Tenerife as an increasingly sustainable tourist destination, where the enjoyment of natural environments aligns with environmental protection efforts.

According to a statement from the company, the system implemented by Teleférico del Teide utilises cutting-edge technological innovations and incorporates energy storage and distribution capabilities throughout the facility.

This energy storage solution for funiculars employs a technique that integrates photovoltaic panels and batteries designed by Swiss, German, and Spanish engineers.

HARNESSING SOLAR ENERGY AND CABIN MOVEMENT

This model capitalises on solar energy and the downward movement of the cabins to provide a sufficient and stable power supply, ensuring the seamless operation of the existing cable car facilities and eliminating the emission of harmful gases into the atmosphere.

The electricity-generating engine utilised until now will remain as a backup for emergency situations only.

Concerning this significant investment project focused on sustainability within a highly protected area in Spain, the president of the Cabildo de Tenerife, Rosa Dávila, remarked during the launch of the new photovoltaic installation that the project “positions Tenerife at the forefront globally within a national park, featuring a 100% sustainable system powered by solar energy and marking a substantial stride towards the eradication of greenhouse gases.”

Dávila emphasised that “today represents a monumental day for Teide and Tenerife; the technological world is keenly interested in this example we have set towards an eco-sustainable island.”

Similarly, Ignacio Sabaté, the managing director of Teleférico del Teide, shared his thoughts, underscoring that this initiative aims to convey a hopeful and dedicated message, “in that actions can indeed be undertaken against climate change.”

“If we could accomplish this under challenging technical circumstances, then any institution or company should also be resolute in working towards the same objectives,” he asserted.

This newly established renewable energy installation reflects one of the largest investments in the history of the Teide Cable Car, amounting to two million euros, primarily financed through its own resources and, to a lesser extent, via Next Generation funds from the EU.

The cable car is among the few electrically autonomous systems globally, meaning it is not linked to the public or conventional electrical network, as there are no power lines running through the national park.

DOES NOT OCCUPY NEW LAND

The company has achieved self-sufficiency by generating its own clean, 100% renewable energy using solar panels located at existing facilities, without requiring any additional land within the National Park.

The climatic conditions in the Teide National Park are extreme, with significant temperature contrasts between cold and heat, and the atmospheric pressure to which the materials and equipment are exposed, situated at 2,356 metres above sea level, nearly at the summit of Spain.

These climatic challenges are compounded by the requirement to ensure the installation of such a complex system can occur without disrupting the normal operation of the cabins.

The innovative clean energy system, known as the ESFOR system, was developed by one of the industry’s leading global companies, the Austrian Doppelmayr Group, which encompasses the Swiss firm Frey AG.

The facilities’ isolated network (microgrid) has been designed by R7, a Canarian innovation and technology company, using Cegasa storage technology (Spain) and Riello equipment (Italy).

Related Posts

A Santa Cruz resident films a group of youths engaged in vandalism: “They’re wrecking the area and shouting.”
Diario de Avisos

A Santa Cruz resident films a group of youths engaged in vandalism: “They’re wrecking the area and shouting.”

July 17, 2025
Fire in Tenerife: A Vast Column of Smoke Visible from Miles Away
Diario de Avisos

Fire in Tenerife: A Vast Column of Smoke Visible from Miles Away

July 17, 2025
Residents of Los Realejos at odds over the installation of a gas and fossil fuel plant 30 metres from their homes
Diario de Avisos

Residents of Los Realejos at odds over the installation of a gas and fossil fuel plant 30 metres from their homes

July 16, 2025
No Result
View All Result

Click Image to Join Community

Tenerife Forum Community

Previous News

Police Crackdown Uncovers Nearly 300 Fake Goods in Santa Cruz de Tenerife

Police Crackdown Uncovers Nearly 300 Fake Goods in Santa Cruz de Tenerife

6 months ago
A local police officer in Santa Cruz de Tenerife is fined for assaulting a woman

A local police officer in Santa Cruz de Tenerife is fined for assaulting a woman

2 years ago
More than 60,000 pilgrims in the first post-pandemic Relief Descent

More than 60,000 pilgrims in the first post-pandemic Relief Descent

3 years ago
Authorities and employees agree on the bases to stabilize temporary workers

Authorities and employees agree on the bases to stabilize temporary workers

3 years ago
A pioneering study from the University of La Laguna establishes a link between asthma attacks and genetic changes

A pioneering study from the University of La Laguna establishes a link between asthma attacks and genetic changes

2 years ago
The Tapas Journey in La Laguna smashes records with nearly 80,000 tapas sold

The Tapas Journey in La Laguna smashes records with nearly 80,000 tapas sold

12 months ago
No Result
View All Result

News Highlights

The giant Zamna reveals its lineup of artists for the upcoming launch in Tenerife.

Can La Palma Have Its First Geothermal Power Station? Here Are the Areas Being Investigated

The Majorero Donkey Endures the Heat to Succeed in Aguere

Our Lady of Mount Carmel (and III)

The tram strike committee resumes negotiations with Metropolitano de Tenerife.

Sardà and Valdano Reflect on Maturity in a CaixaBank Discussion in Tenerife

Trending News

Cultural Agenda for La Laguna from 18th to 24th July 2025
La Laguna

Cultural Agenda for La Laguna from 18th to 24th July 2025

by Admin
July 18, 2025
0

Lyrical Gala in aid of the Red Cross DATE: Friday 18th July TIME: 20:00 LOCATION: Teatro Leal...

Aemet Issues Severe Heat Warnings in the Canaries: We’re Not Ready

Aemet Issues Severe Heat Warnings in the Canaries: We’re Not Ready

July 18, 2025
The Canary Sports Observatory: Rigorous and Accessible Data for Informed Decision-Making

The Canary Sports Observatory: Rigorous and Accessible Data for Informed Decision-Making

July 18, 2025
The giant Zamna reveals its lineup of artists for the upcoming launch in Tenerife.

The giant Zamna reveals its lineup of artists for the upcoming launch in Tenerife.

July 18, 2025
Can La Palma Have Its First Geothermal Power Station? Here Are the Areas Being Investigated

Can La Palma Have Its First Geothermal Power Station? Here Are the Areas Being Investigated

July 18, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Guide
  • Adobe
  • Linkedin
  • Privacy Policy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly