Sunday, September 21, 2025
Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home El Dia

The Canary Islands Administration Aims to Cut Additional Costs for Tenerife Island Ring Project

April 9, 2024
in El Dia
Reading Time: 3 mins read
0
The Canary Islands Administration Aims to Cut Additional Costs for Tenerife Island Ring Project
4
SHARES
Share on FacebookShare on Twitter


The Government of the Canary Islands intends to minimise the extra cost of closing the Anillo Insular between Santiago del Teide and El Tanque due to the ruling of the Superior Court of Justice of the Canary Islands (TSJC), which annulled the awarding of the project. At the same time, the priority is for the work not to stop – over 60% of the project is already completed – and to be completed by March 2025, as planned, regardless of the final judicial decision.

This was announced yesterday by Pablo Rodríguez, the councillor for Public Works, Transport and Housing of the regional government, who argued that the judicial decision “will involve a significant extra cost due to a decision that did not comply with the law, as determined by the TSJC.” Pending the legal services report on whether to file an appeal – a measure that the temporary joint venture implementing the project can also take as a co-defendant – the objective is “to finish the work as soon as possible, without delays,” as well as to “minimise the additional cost as much as possible.” “I do not want to provide figures for a future negotiation that may take place,” he added.

In a ruling issued on 14th March, the TSJC annulled the award that the regional government made by excluding the bid from the Joint Venture (UTE) Obrascon Huarte Lain, SA-Sociedad Anónima-Trabajos y Obras-Excavaciones Bahillo, SL-Asfaltos Bahillo, SL. This UTE was provisionally awarded at the proposal of the Contracting Board, a decree signed by Pablo Rodríguez on 4th June 2019. The change of government in July of that year coincided with an appeal filed by the second highest-rated company in this bid.

263.5 million Euros

After several reports and counter-reports, the Administrative Tribunal for Public Contracts of the Autonomous Community and the new department assigned the project to the UTE FCC Construcción, Syocsa-Inarsa and El Silbo for 240,370,796 euros, although its current cost is now 263.5 million Euros due to price adjustments. The decree was signed on 30th September 2019.

“The worst part is that it will have a significant extra cost,”

Pablo Rodríguez

— Councillor for Public Works of the Government of the Canary Islands

“We will defend the general interest,” stated Pablo Rodríguez yesterday, who maintained that “I have never seen such a significant change in criteria in an award, especially one of this nature,” as “it is the most important project budget-wise in the Road Agreement. Over 300 million Euros in tender value.” The councillor emphasised that the Canary Islands Government will work “to prevent this from happening again, to ensure that procedures are as clean and transparent as possible.” After reminding that the TSJC ruling “sides with the Contracting Board,” the Public Works representative concluded: “The worst part is that it will have a significant extra cost.”

In the Canary Islands Parliament session, Pablo Rodríguez will respond today to two questions on this matter posed by the two parties that form the regional government through their regional deputies Jonathan Martín Fumero (Coalición Canaria) and Luz Reverón González (Partido Popular).

The project, of which over 60% has already been completed, consists of an 11.3 km road linking the Anillo Insular between El Tanque (North) and Santiago del Teide (South). It includes the Erjos Tunnel, consisting of two parallel tubes of 5.1 km each, passing under the Teno Massif. It is the third longest tunnel in Spain.

Related Posts

‘La Amable’: A Warm Welcome
El Dia

‘La Amable’: A Warm Welcome

September 21, 2025
Tenerife News Today | Five Young People, Including a Minor, Injured in Vehicle Flip in Adeje
El Dia

Tenerife News Today | Five Young People, Including a Minor, Injured in Vehicle Flip in Adeje

September 20, 2025
Weekend Activities in Tenerife: A Comprehensive Guide
El Dia

Weekend Activities in Tenerife: A Comprehensive Guide

September 20, 2025
No Result
View All Result

Latest Blog Articles

  • Blog
Dolphin Encounters in Tenerife: A Journey Through the Waves

Dolphin Encounters in Tenerife: A Journey Through the Waves

3 days ago
Why Tenerife Could Be the Surprise Winner as American Tourism Takes a Hit

Why Tenerife Could Be the Surprise Winner as American Tourism Takes a Hit

3 days ago
Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

6 days ago
El Médano: A Hidden Gem for Windsurfing Enthusiasts

El Médano: A Hidden Gem for Windsurfing Enthusiasts

1 week ago
Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

1 week ago
Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

1 week ago
No Result
View All Result

News Highlights

Fiestas de Santísimo Cristo de La Laguna 2025: Sunday 21st September, Day of the Octave and Festival Closure

Santa Cruz Opens Second Dr. Blas García Clinic Centre

San Sebastián: A Cultural and Culinary Delight

Los Cristianos Undergoes Comprehensive Transformation After Decades Without Major Developments

Tellado advocates for a migration policy “like that of other countries” and increased control in the Canary Islands

UN urges that hate speech in council chambers be reported to the Public Prosecutor’s Office

Trending News

‘La Amable’: A Warm Welcome
El Dia

‘La Amable’: A Warm Welcome

by Admin
September 21, 2025
0

Romería de San José en San Juan de la Rambla

The Train in the Canary Islands Faces Challenges from Volcanic Terrain and Elevation Changes

The Train in the Canary Islands Faces Challenges from Volcanic Terrain and Elevation Changes

September 21, 2025
Will the trains resolve the ongoing crisis in the Canary Islands? Experts are divided.

Will the trains resolve the ongoing crisis in the Canary Islands? Experts are divided.

September 21, 2025
Fiestas de Santísimo Cristo de La Laguna 2025: Sunday 21st September, Day of the Octave and Festival Closure

Fiestas de Santísimo Cristo de La Laguna 2025: Sunday 21st September, Day of the Octave and Festival Closure

September 21, 2025
Santa Cruz Opens Second Dr. Blas García Clinic Centre

Santa Cruz Opens Second Dr. Blas García Clinic Centre

September 21, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Canarian News
  • Privacy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly