Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home El Dia

They condemn the Government of the Canary Islands to pay 2.5 million for delays in the island ring

November 17, 2023
in El Dia
Reading Time: 3 mins read
0
They condemn the Government of the Canary Islands to pay 2.5 million for delays in the island ring
4
SHARES
Share on FacebookShare on Twitter


The Superior Court of Justice of the Canary Islands (TSJC) has condemned the Ministry of Public Works of the Government of the Canary Islands to pay un minimum of 2.5 million euros to the successful bidders of a section of the island ring due to the delay of the first 20% of the budget and the subsequent price revision.

This amount is due Add he increase in the General Indirect Tax of the Canary Islands (IGIC) which went from 5 to 7% in that period and the damage is estimated due to the maintenance of the guarantees for the months of delay and the legal interest from the presentation of the claim until the payment.

The TSJC maintains that there was a widespread delay due to lack of land availabilityan issue for which the central Government is not responsible, as the Canary Islands Executive maintained.

At the end of 2019, the successful bidders asked to be compensated with almost 30 million as a result of the change in contractual provisions in the Adeje-Santiago subsection of the Teidein its connection with the Port of Fonsalía in charge of the UTE Adeje Santiago, once their request was rejected through administrative means.

At the end of 2020, the figure had already been reduced to 18 and a half million and an agreement was still not reached. Days later, the Government partially approved the request but limited it to almost 10 million, so The company complained to the TSJC to recognize him as much, which the Ministry opposed.

In the sentence released now it is recalled that The work had an award budget of 168 millionof which one million corresponded to the drafting of the project.

The Erjos tunnel will have four entry and exit lanes

The Erjos tunnel will have four entry and exit lanes

The project

He contract signed at the end of 2006 was subject to two modifications and 13 readjustments of annuities, six price reviews and four addendums or complements, so the planned execution period of 31 months could not be met.

In fact, in front of the projected to finish the works in July 2009 The completion was in the last months of 2016 but the works were not received until a year later.

He second contract to build the El Bicho Tunnel It was signed at the beginning of 2011 for almost 23 million and a period of two years, but the project also underwent modifications so it took three years.

The UTE presented a “detailed” account of the 57 antecedents that reflect a chronology of what was claimed until reaching a total of 214 million, for which they consider the damages and losses generated “disproportionate” for which they blame the Administration.

The result is that the performance went from being carried out in the planned 31 months to 120or in other words, there was a gap of 89 months, due to delays in the processing and approval of the modified projects, continuous readjustments of annuities, variations in rhythms and deadlines or delays in the occupation of the land.

The same thing happened with the granting of authorizations to replace affected servicesin the processing of environmental conditions required in the execution of the first 20% of the budget, a figure now recognized.

The Canarian Government blamed the Ministry of Development for the reduction of the contribution to the Agreement and alleged that the expropriations did not stop the work, that the period that coincides with the execution of 20% of the budget -33.5 million- no complaint was ever filed and the certifications were paid



Source link

Related Posts

The Magician’s Dance Brings Together 12,000 People Around 700 Tables
El Dia

The Magician’s Dance Brings Together 12,000 People Around 700 Tables

July 12, 2025
SAN FERMINES TENERIFE | A neighbourhood in Tenerife kicks off the ‘txupinazo’ and celebrates its own bull run for San Fermín
El Dia

SAN FERMINES TENERIFE | A neighbourhood in Tenerife kicks off the ‘txupinazo’ and celebrates its own bull run for San Fermín

July 11, 2025
Fepeco and Güímar Explore Solutions for Public Housing
El Dia

Fepeco and Güímar Explore Solutions for Public Housing

July 11, 2025
No Result
View All Result

Click Image to Join Community

Tenerife Forum Community

Previous News

Quiet night at the Burial of the Sardine in Santa Cruz

Quiet night at the Burial of the Sardine in Santa Cruz

3 years ago
Sandra Izquierdo, first mayoress of Tacoronte after the PSOE, CC and PP pact

Sandra Izquierdo, first mayoress of Tacoronte after the PSOE, CC and PP pact

2 years ago
El Gordo falls in Las Palmas de Gran Canaria

El Gordo falls in Las Palmas de Gran Canaria

2 years ago
Tenerife’s Ecotasa Sparks Interest in the British Media: A Closer Look

Tenerife’s Ecotasa Sparks Interest in the British Media: A Closer Look

2 months ago
The 200 million dollar superyacht that is in the Port of Santa Cruz de Tenerife and pays tribute to the Beatles

The 200 million dollar superyacht that is in the Port of Santa Cruz de Tenerife and pays tribute to the Beatles

2 years ago
Meeting Point Ensures Smooth Operations of Canary Islands Hotels Following FTI’s Bankruptcy

Meeting Point Ensures Smooth Operations of Canary Islands Hotels Following FTI’s Bankruptcy

1 year ago
No Result
View All Result

News Highlights

Canaries loses its traditional pubs

The Cabildo to Provide Work Placements for 450 ULL Students in the 2025-2026 Academic Year

The Magician’s Dance Brings Together 12,000 People Around 700 Tables

A Estate, a Saint, and a Pilgrimage (Part III). By Julio Torres Santos

No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife

A union denounces the alteration of customs officers’ shifts as malpractice.

Trending News

The Canarian Beach Bar with Sea Views Recognised by the Repsol Guide: “Fresh Fish”
Atlantico

The Canarian Beach Bar with Sea Views Recognised by the Repsol Guide: “Fresh Fish”

by Admin
July 12, 2025
0

The sun gently sets over the coast, the sound of the sea lulls the downtime, and the...

Three New Multisport Facilities in Santa Cruz de Tenerife, La Laguna, and Arona

Three New Multisport Facilities in Santa Cruz de Tenerife, La Laguna, and Arona

July 12, 2025
Tram workers report that there are still traces of silica sand on the tracks and in the depots.

Tram workers report that there are still traces of silica sand on the tracks and in the depots.

July 12, 2025
Canaries loses its traditional pubs

Canaries loses its traditional pubs

July 12, 2025
The Cabildo to Provide Work Placements for 450 ULL Students in the 2025-2026 Academic Year

The Cabildo to Provide Work Placements for 450 ULL Students in the 2025-2026 Academic Year

July 12, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Guide
  • Adobe
  • Linkedin
  • Privacy Policy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly