SANTA CRUZ DE TENERIFE, September 26 (EUROPA PRESS) –
The Cabildo of Tenerife has put on public display the project for the execution of the direct lanes that will give access to the Güímar Industrial Estate, as published in the Official Gazette of the Province (BOP) in its edition of last Monday, September 25. . The actions, which have a budget of 2.2 million euros, will consist of the modification of the branches and the construction of two new direct links to the Polygon.
The Minister of Mobility, Eulalia García, explained that the successive expansions of the Polígono Valle de Güímar mean that traffic has increased very significantly. The latest additions of commercial spaces in the Polígono, as well as in the new Polígono El Carretón without having its own access and exit roads to the TF-1 highway, have meant that traffic is frequently backed up, which is why it is “important “act on the link in order to provide it with direct links that release part of the traffic load received by the two existing roundabouts.”
The project proposes to execute several direct lanes in the roundabouts of the Arafo interchange. On the one hand, a direct lane from the TF-281 towards the TF-1 heading south in addition to another direct lane from the TF-1 (Santa Cruz) towards the El Carretón Industrial Estate while two lanes are contemplated on the coastal side. from the Polígono Valle de Güímar towards the TF-1 (direction Santa Cruz) and a direct lane from the TF-1 (South) towards the Polígono.
The project will remain on public display for a period of 20 business days from the day following its publication in the Official Gazette of the Province.