Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home Diario de Avisos

The IES Parque La Reina opens on Monday

September 6, 2023
in Diario de Avisos
Reading Time: 2 mins read
0
The IES Parque La Reina opens on Monday
7
SHARES
Share on FacebookShare on Twitter


The barracks of the institute of Guaza They are already history. 21 years later of its “provisional” opening to face the population boom of the South at the beginning of the century, the last educational center built entirely with prefabricated modules in the Canary Islands will not open its doors next Monday to inaugurate the 2023-24 school year.

In its place will finally be the IES Parque La Reina, the largest institute in the Archipelago, with 14,126 meters of urbanization (9,620 of them built), distributed over three floors and a semi-basement, where 800 students will study and more than 70 teachers will teach.

After a delay of almost three and a half years over the scheduled time to complete the work, which was practically stopped for two years due to a modification of the project requested by the construction company and the pandemic, next Monday the presentation of the first-year students will take place. of ESO, an event that will continue the next day with the students of the second, third and fourth years of ESO, as well as the first and second years of Baccalaureate. On Wednesday the 13th the school day will begin for all levels.

“We are happy, although the general feeling of mothers and fathers is a certain disbelief after so many years of struggle, so until we see the boys and girls inside, we do not believe it,” María told DIARIO DE AVISOS yesterday. José Flores, president of the AMPA, who, after thanking the support received from mothers, fathers, teachers and the director of IES Guaza, regretted that “there are people who wear medals after so many years have passed, more than 20, to something so necessary and that is a right of students and families.”

The new educational center, in which almost 8 million euros have been invested, has nothing to do with the precarious facilities of the thirty classrooms in Guaza in which thousands of students from the South have been trained for more than two decades. Students will no longer have to suffer unbearable temperatures, suspend classes due to leaks when it rains, nor will floors or walls vibrate, nor will bathroom pipes burst anymore.

PROTESTS

The technical deficiencies provoked numerous protests from mothers, fathers, teachers and students, who intensified their complaints as a result of the delay in the work of the new center and tired of seeing how the deadlines and forecasts transmitted to them by those responsible for the Ministry were not met. of Education.

The new building will have 31 units and will have spaces for computing, music and art, among other subjects, as well as a library, technology workshop, laboratories, language classroom and cafeteria. It also has a covered pavilion, a large central patio, assembly hall, wrestling arena, orchard, garden areas, play areas and parking. In recent weeks, the Arona City Council has reorganized traffic and resurfaced the area to improve accessibility.

In addition, it will enable an exclusive parking area for school buses with the aim of not taking up space on the roads and avoiding queues and delays at school start and end times.



Source link

Related Posts

A Santa Cruz resident films a group of youths engaged in vandalism: “They’re wrecking the area and shouting.”
Diario de Avisos

A Santa Cruz resident films a group of youths engaged in vandalism: “They’re wrecking the area and shouting.”

July 17, 2025
Fire in Tenerife: A Vast Column of Smoke Visible from Miles Away
Diario de Avisos

Fire in Tenerife: A Vast Column of Smoke Visible from Miles Away

July 17, 2025
Residents of Los Realejos at odds over the installation of a gas and fossil fuel plant 30 metres from their homes
Diario de Avisos

Residents of Los Realejos at odds over the installation of a gas and fossil fuel plant 30 metres from their homes

July 16, 2025
No Result
View All Result

Click Image to Join Community

Tenerife Forum Community

Previous News

One million to eliminate flooding in Las Chumberas

One million to eliminate flooding in Las Chumberas

3 years ago
The City Council organizes the “Ruta de la Tapa” with the participation of 17 catering establishments located on the coast of the municipality

The City Council organizes the “Ruta de la Tapa” with the participation of 17 catering establishments located on the coast of the municipality

4 years ago
Tenerife Graffiti Artist Detained for Confronting Agent During Bold City Art Session

Tenerife Graffiti Artist Detained for Confronting Agent During Bold City Art Session

9 months ago
“We have achieved that older people are the ones who decide what they want to do, how and when”

“We have achieved that older people are the ones who decide what they want to do, how and when”

2 years ago
End of Wind Pre-Alert in the Canary Islands

End of Wind Pre-Alert in the Canary Islands

1 year ago
Puertos de Tenerife “categorically” denies an alleged favorable treatment in the construction of the cruise terminal

Puertos de Tenerife “categorically” denies an alleged favorable treatment in the construction of the cruise terminal

2 years ago
No Result
View All Result

News Highlights

Our Lady of Mount Carmel (and III)

The tram strike committee resumes negotiations with Metropolitano de Tenerife.

Sardà and Valdano Reflect on Maturity in a CaixaBank Discussion in Tenerife

The Leal Theatre presents a musical journey for all audiences this weekend.

Unions announce new meetings to resolve the employment dispute at the Tenerife Metropolitano.

Santa Cruz closes the Las Mesas park due to wildfire risk.

Trending News

The giant Zamna reveals its lineup of artists for the upcoming launch in Tenerife.
La Laguna

The giant Zamna reveals its lineup of artists for the upcoming launch in Tenerife.

by Admin
July 18, 2025
0

The international electronic music brand, one of the most prestigious in the world, will debut on the...

Can La Palma Have Its First Geothermal Power Station? Here Are the Areas Being Investigated

Can La Palma Have Its First Geothermal Power Station? Here Are the Areas Being Investigated

July 18, 2025
The Majorero Donkey Endures the Heat to Succeed in Aguere

The Majorero Donkey Endures the Heat to Succeed in Aguere

July 18, 2025
Our Lady of Mount Carmel (and III)

Our Lady of Mount Carmel (and III)

July 18, 2025
The tram strike committee resumes negotiations with Metropolitano de Tenerife.

The tram strike committee resumes negotiations with Metropolitano de Tenerife.

July 18, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Guide
  • Adobe
  • Linkedin
  • Privacy Policy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly