Friday, September 19, 2025
Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home Europa Press

The drafting of the second Erjos tunnel (Tenerife) is completed

September 1, 2023
in Europa Press
Reading Time: 2 mins read
0
The drafting of the second Erjos tunnel (Tenerife) is completed
5
SHARES
Share on FacebookShare on Twitter



SANTA CRUZ DE TENERIFE, September 1 (EUROPA PRESS) –

The Department of Public Works, Housing and Mobility of the Government of the Canary Islands reports this Friday of the completion of the opening of the second Erjos tunnel, within the construction works of the highway between Santiago del Teide and El Tanque, which is part of the ‘Ring Island of Tenerife’.

The Erjos tunnel consists of two parallel tubes, with a length of approximately 4,855 meters, to which two false tunnels should be added – 140 meters in the south mouth and 100 meters in the north mouth -, with a total length of 5.1 kilometres, which makes it the longest road tunnel in the Canary Islands and the most important and largest road infrastructure developed by the regional Government, and the one with the greatest value at the national level, not only by volume of investment, but for the social, economic and mobility needs it covers.

The first cale occurred on June 26, 2023, and this second, in the advance phase, on August 15.

The drilling, which has been carried out mainly by blasting, has been carried out in two phases with the aim of reducing the pressures transmitted by the ground in the process of stabilizing the vault: a first advance at the top and a second called destroys, in the remaining part.

Drilling is currently being carried out in the destruction phase, in the lower part, the Government details in a note.

To carry out this work, included in the Highway Agreement with the State, a significant deployment of specialized workers and machinery has been designated to carry out the drilling.

In addition, three work shifts have been established, seven days a week and 24 hours a day, employing more than 300 direct workers.

The investment budget of the project amounts to 256 million euros and the works were awarded in September 2019 to the joint venture formed by FCC Construction, Syocsa-Inarsa and El Silbo. To date, more than 50% of the work has already been completed, and it is expected to be completed in the first half of 2025.

The tender budget includes environmental measures, which will involve an investment of 18 million euros, consisting mainly of the recovery and consolidation of habitats of community interest, as well as the restoration of the La Grama quarries and the Bilma mountain. , and the construction of an edge park that protects the core of Santiago del Teide.



Source link

Related Posts

Podemos Calls for Suspension of La Laguna-Tenerife-Bnei Herzliya Basketball Champions League Match
Europa Press

Podemos Calls for Suspension of La Laguna-Tenerife-Bnei Herzliya Basketball Champions League Match

September 18, 2025
Canary Islands and Euskadi Forge Alliance Advocating “Practical Politics” Against National “Polarisation”
Europa Press

Canary Islands and Euskadi Forge Alliance Advocating “Practical Politics” Against National “Polarisation”

September 11, 2025
Clavijo and Pradales to Sign Bilateral R&D Agreement in the Canaries this Thursday
Europa Press

Clavijo and Pradales to Sign Bilateral R&D Agreement in the Canaries this Thursday

September 11, 2025
No Result
View All Result

Latest Blog Articles

  • Blog
Dolphin Encounters in Tenerife: A Journey Through the Waves

Dolphin Encounters in Tenerife: A Journey Through the Waves

1 day ago
Why Tenerife Could Be the Surprise Winner as American Tourism Takes a Hit

Why Tenerife Could Be the Surprise Winner as American Tourism Takes a Hit

1 day ago
Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

4 days ago
El Médano: A Hidden Gem for Windsurfing Enthusiasts

El Médano: A Hidden Gem for Windsurfing Enthusiasts

1 week ago
Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

1 week ago
Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

1 week ago
No Result
View All Result

News Highlights

La Laguna Prepares for the Final Cultural, Sporting, and Religious Events of the 2025 Cristo Festival

CaixaBank Dualiza Launches the Dualiza Call for Canary Islands Vocational Training Centres in Tenerife

PSOE=Devil: Two Suspects Released and Judicial Silence

Ez Property Solutions Chief to Civil Guard Who Arrested Him: “Sewer Rat”

Alexis Cárdenas: Violin Virtuoso at the Classical Laguna Experience

Aena to allocate over €6.5 billion for expansions of major airports by 2031

Trending News

The Fate of the Suspects in the Belgian Couple’s Murder in Tenerife Lies with the Jury
El Dia

The Fate of the Suspects in the Belgian Couple’s Murder in Tenerife Lies with the Jury

by Admin
September 19, 2025
0

Three Arrested Suspected in Belgian Couple's Murder in Tenerife The three individuals arrested in connection with the...

Only 33% of Santa Cruz Shops Have Parking Within 50 Metres

Only 33% of Santa Cruz Shops Have Parking Within 50 Metres

September 19, 2025
Ryanair Announces Layoff of Over 100 Ground Staff at Santiago Airport

Ryanair Announces Layoff of Over 100 Ground Staff at Santiago Airport

September 19, 2025
La Laguna Prepares for the Final Cultural, Sporting, and Religious Events of the 2025 Cristo Festival

La Laguna Prepares for the Final Cultural, Sporting, and Religious Events of the 2025 Cristo Festival

September 19, 2025
CaixaBank Dualiza Launches the Dualiza Call for Canary Islands Vocational Training Centres in Tenerife

CaixaBank Dualiza Launches the Dualiza Call for Canary Islands Vocational Training Centres in Tenerife

September 19, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Canarian News
  • Privacy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly