Tuesday, September 23, 2025
Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home La Provincia

Awarded the Tenerife Motor Circuit for more than 44 million euros

August 3, 2023
in La Provincia
Reading Time: 4 mins read
0
Awarded the Tenerife Motor Circuit for more than 44 million euros
5
SHARES
Share on FacebookShare on Twitter



Awarded the Tenerife Motor Circuit for more than 44 million euros

The Cabildo awarded the first phase of the motor circuit Tenerife to the Temporary Union of Companies (UTE) Sacyr Construcción SA-Contratas y Servicios Bahillos SL, for 44,165,489 euros. The works will consist of adapting the scope of action to the Avenues Defense Plan with the channeling of three ravines, the removable stands and the speed track, as well as the proposed improvements that consist of executing parking lots for the public and executing the autocross circuit. .

The works have a term of 40 months for its realization, with an additional guarantee of four years once the Cabildo proceeds to its reception, as stated in the resolution of the Highway and Landscape service of the insular Corporation, in which the proposal of the Contracting Table is accepted, as published today in the Public Sector Contracting Platform.

Approved by the International Automobile Federation (FIA) -has the support of Formula 1 driver Carlos Sáinz- and the International Motorcycling Federation (FIM) the Tenerife Motor Circuit will be prepared for racing and training Formula 1 and MotoGPthe highest categories in both modalities.

Infographic of the facilities projected for the Circuito del Motor de Tenerife. THE DAY


Some features

LThe runway will be 4,050 meters long, with a width of 12 to 15 meters and its route will be done in an anti-clockwise direction, one of the few circuits in the world that has this characteristic. Your design includes 11 curves to the left and five to the rightwith a radius of 21 meters to 100 meters, with the longest straight of 800 meters and a slope of 5%, which becomes 1% in another minor line.

top speed It will be 320 kilometers per hour, in the case of cars, and 315 kilometers per hour in the case of motorcycles. The minimum speed is established between 95 and 80 kilometers per hour in cars and motorcycles, respectively. It is estimated that the lap time for the cars will be 1’15” and 1’35” for the motorcycles. The paddock (grading and installations for removable stands) will cover 72,000 square metres. It will have 15 boxes for cars and 45 boxes for motorcycles.

The tender for the first phase of the Tenerife Motor Circuit had a budget of 48,563,471. On July 19, 2022, the project was presented in the Symphony Hall of the Tenerife Auditorium in front of 900 people, most of them involved in the automobile and motorcycling activity on the Island. An act that was moderated by the journalist Antonio Lobato and that featured the pilot Carlos Sainz Juniorthe motorcyclist Carlos Checa and the Italian-Tinerifician Christine Giampaoli Zonca (GZ).

“We are in the process and this time is the most serious in which the Circuit is faced. We have the item in the budget and it is only a matter of time,” said the then island councilor for Highways, Enrique Arriaga. “This is not an occurrence, but to fulfill a commitment and an electoral promise,” the president of the Cabildo during the previous term, Pedro Martín, declared in the act.

Infographic of the situation of the Insuar Motor Circuit of Tenerife. THE DAY


A long story

The history of the Tenerife Motor Circuit began on October 30, 1990, when the Cabildo and the company TN, from Barcelona, ​​signed an agreement to draw up the project, which it developed from 1997 to 2000, but it will not be the one that will be built. On March 25, 1995, the Tenerife Island Corporation opened the file for the Motor Sports Center (first name of the complex), definitively approved by the Plenary on March 12, 2008. It would not be until May 18, 2015 when the The Cabildo awarded the work to the company Kiti Trans SLU, which laid the first stone on October 28, 2016. Almost eleven months later, in June 2017, the works were paralyzed and the Cabildo terminated the contract with the winning company. In October 2020, the works of the North access began while the project was being finalized. The Tenerife Motor Circuit will be built in the Los Duques de Atogo area, in the municipality of Granadilla de Abona and a few kilometers from Tenerife South Airport. Its award budget reaches 47,247,443 euros with the application of 7% of the IGIC.



Source link

Related Posts

Wind and Fog Leave Hundreds of Passengers Stranded in Tenerife
La Provincia

Wind and Fog Leave Hundreds of Passengers Stranded in Tenerife

July 6, 2025
Canaries Roll: From Sancheski to Skate
La Provincia

Canaries Roll: From Sancheski to Skate

July 6, 2025
Coque Malla stars in ‘The Threepenny Opera’, new project from ‘Segunda Lectura’ at the Pérez Galdós Theatre.
La Provincia

Coque Malla stars in ‘The Threepenny Opera’, new project from ‘Segunda Lectura’ at the Pérez Galdós Theatre.

July 2, 2025
No Result
View All Result

Latest Blog Articles

  • Blog
Trailblazing Tenerife: Discover the Wonders of Hiking Teide

Trailblazing Tenerife: Discover the Wonders of Hiking Teide

2 days ago
Dolphin Encounters in Tenerife: A Journey Through the Waves

Dolphin Encounters in Tenerife: A Journey Through the Waves

5 days ago
Why Tenerife Could Be the Surprise Winner as American Tourism Takes a Hit

Why Tenerife Could Be the Surprise Winner as American Tourism Takes a Hit

5 days ago
Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

1 week ago
El Médano: A Hidden Gem for Windsurfing Enthusiasts

El Médano: A Hidden Gem for Windsurfing Enthusiasts

2 weeks ago
Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

2 weeks ago
No Result
View All Result

News Highlights

The Tenerife Village That Withstood Pirates and Eruptions, Now Captivating National Geographic

Desperation Among Farmers Over Challenges Selling Local Potatoes Due to Imports from the UK, Israel, and Egypt

Fundación Canarina Criticises Train Project in Canary Islands: “It’s Unfeasible and Excessive”

24 Machines to Enhance Passport Control at Tenerife South Airport

The La Laguna Market: Autumn Recipes Featuring Seasonal Fruits

La Laguna Boosts Recycling Rates and Progresses Towards a More Sustainable City Model

Trending News

Two Years for Self-Radicalisation as a Terrorist for Jihadist Detected in Tenerife
Atlantico

Two Years for Self-Radicalisation as a Terrorist for Jihadist Detected in Tenerife

by Admin
September 23, 2025
0

National Court Sentences Man to Two and a Half Years for Terrorist Self-Radicalisation Background of the Case...

Operation Against Drug Trafficking in Tenerife: Tons of Cocaine, Firearms and Money Laundering

Operation Against Drug Trafficking in Tenerife: Tons of Cocaine, Firearms and Money Laundering

September 23, 2025
The Cabildo and the Architects’ Association Host the First Training Days on Cultural Heritage Intervention

The Cabildo and the Architects’ Association Host the First Training Days on Cultural Heritage Intervention

September 23, 2025
The Tenerife Village That Withstood Pirates and Eruptions, Now Captivating National Geographic

The Tenerife Village That Withstood Pirates and Eruptions, Now Captivating National Geographic

September 23, 2025
Desperation Among Farmers Over Challenges Selling Local Potatoes Due to Imports from the UK, Israel, and Egypt

Desperation Among Farmers Over Challenges Selling Local Potatoes Due to Imports from the UK, Israel, and Egypt

September 23, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Canarian News
  • Privacy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly