Sunday, September 21, 2025
Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home El Dia

Countdown to the demolition of the old swimming pool in San Juan de la Rambla

February 23, 2023
in El Dia
Reading Time: 4 mins read
0
Countdown to the demolition of the old swimming pool in San Juan de la Rambla
4
SHARES
Share on FacebookShare on Twitter


The countdown to the demolition of the old pool of Las Aguas and the improvement of the coastline, in San Juan de la Ramblahas already started. The General Directorate of the Coast and the Seadependent on the Government of Spain, has just awarded the works for €1,865,000 to a Temporary Union of Companies formed by Yárritu SA and Signaling Villar SA. As soon as the start of the works is signed, an execution period of 12 months will begin, so the new image of this northern coastal enclave should be a reality throughout the next year 2024.

The technical project foresees the total demolition and removal of the rubble from the pool so that the coast recovers its original profile. A small square and a pedestrian promenade on two levels will be built on the plot. In addition, there will be new access ramps to the small sandy and rocky beach that exists in the area closest to the cliff.

The pool of Las Aguas it was closed at the beginning of 2010, after concluding the last administrative concession of this space. Since 2006 demolition had been considered to create a great sandy beach, which Costas budgeted at around 5 million euros. That project never got past the environmental impact study phase, the beach was never built and the pool deteriorated day by day.

Infographic of the project that will be carried out in the area where the Las Aguas pool is now located The day


The sea opened large sinkholes near the foundations of the pool and the entire structure, as well damaged by corrosion, lack of maintenance and vandalismIt threatened to collapse. This project is now focused on eliminating the danger posed by this concrete structure with large walls, a solarium, a kiosk and a three-story building that housed a restaurant, changing rooms and other municipal facilities.

Other discarded projects

Since 2012, any possibility of rehabilitation of the pool has been ruled out. Nor was the idea of ​​demolishing only the pool basin and the solarium area viable to preserve the annex building as an interpretation center linked to the sea and the Site of Community Interest (LIC) Coast of San Juan de la Rambla, which protects the sea caves in the area. This SCI was the main reason why the idea of ​​the large Las Aguas beach was discarded.

Plan of the planned action in Las Aguas The day


Public administrations have been working on this pool demolition project since 2017, when Costas, the Town Hall and the Cabildo de Tenerife They coordinated to execute this demolition, the extension of the promenade and the construction of accesses to the small natural beach.

These three administrations are also working on the pedestrianization of the promenade, which requires the construction of a new street in the southern part of the La Destila road, where they want to build an avenue about 20 meters wide and 170 meters long that will become the new access to the area and a parking space, with between 80 and 100 available spaces. The Ramblero City Council has yet to complete the purchase of the necessary land, which began with a first plot of land in January 2020.

The execution period is 12 months, so the work will end in 2024


decoration

The mayor of San Juan de la Rambla, Ezequiel Dominguez (PSOE), held this Thursday, February 23, 2023, the final award of these works, “which may begin when the contract is definitively signed.” While waiting for this fundamental step, the president is confident that there will be no long delays and Las Aguas will be able to be free of the ruins of the pool “throughout 2024.”

“We are happy”

“We are happy because that deteriorated element is finally going to disappear and we are going to be able to recover part of the coast from before. In addition, we continue to work on a global project for Las Aguas which, with the help of the island program Tenerife and the Sea, you will see the entire avenue improve,” the mayor advances. The demolition of another building in a dilapidated state that affects the first line of this road is also planned. In parallel form, the rambler Town Hall the procedures for the new street, which will run behind the houses and restaurants, continue. An ambitious project that began with the purchase of land and that, according to Domínguez, “will require the financial support of other administrations because it is a very important action.”

The change in the image of the coast of Las Aguas “will be very important”, in the opinion of Ezekiel Dominguez, since some ruins that have a great visual impact are going to be eliminated and, in addition, “the old beach of this coastal nucleus will once again gain prominence.” In his opinion, “the residents of this area of ​​the municipality defend the elimination of the old pool because they hope to recover part of the coast and the puddles they knew in the past.”



Source link

Related Posts

‘La Amable’: A Warm Welcome
El Dia

‘La Amable’: A Warm Welcome

September 21, 2025
Tenerife News Today | Five Young People, Including a Minor, Injured in Vehicle Flip in Adeje
El Dia

Tenerife News Today | Five Young People, Including a Minor, Injured in Vehicle Flip in Adeje

September 20, 2025
Weekend Activities in Tenerife: A Comprehensive Guide
El Dia

Weekend Activities in Tenerife: A Comprehensive Guide

September 20, 2025
No Result
View All Result

Latest Blog Articles

  • Blog
Dolphin Encounters in Tenerife: A Journey Through the Waves

Dolphin Encounters in Tenerife: A Journey Through the Waves

3 days ago
Why Tenerife Could Be the Surprise Winner as American Tourism Takes a Hit

Why Tenerife Could Be the Surprise Winner as American Tourism Takes a Hit

3 days ago
Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

6 days ago
El Médano: A Hidden Gem for Windsurfing Enthusiasts

El Médano: A Hidden Gem for Windsurfing Enthusiasts

1 week ago
Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

1 week ago
Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

1 week ago
No Result
View All Result

News Highlights

Santa Cruz Opens Second Dr. Blas García Clinic Centre

San Sebastián: A Cultural and Culinary Delight

Los Cristianos Undergoes Comprehensive Transformation After Decades Without Major Developments

Tellado advocates for a migration policy “like that of other countries” and increased control in the Canary Islands

UN urges that hate speech in council chambers be reported to the Public Prosecutor’s Office

The Final Stitches of Benito in Northern Tenerife

Trending News

The Train in the Canary Islands Faces Challenges from Volcanic Terrain and Elevation Changes
Atlantico

The Train in the Canary Islands Faces Challenges from Volcanic Terrain and Elevation Changes

by Admin
September 21, 2025
0

Future Railway Projects in the Canary Islands Gain Momentum Both the regional government and the councils of...

Will the trains resolve the ongoing crisis in the Canary Islands? Experts are divided.

Will the trains resolve the ongoing crisis in the Canary Islands? Experts are divided.

September 21, 2025
Fiestas de Santísimo Cristo de La Laguna 2025: Sunday 21st September, Day of the Octave and Festival Closure

Fiestas de Santísimo Cristo de La Laguna 2025: Sunday 21st September, Day of the Octave and Festival Closure

September 21, 2025
Santa Cruz Opens Second Dr. Blas García Clinic Centre

Santa Cruz Opens Second Dr. Blas García Clinic Centre

September 21, 2025
San Sebastián: A Cultural and Culinary Delight

San Sebastián: A Cultural and Culinary Delight

September 21, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Canarian News
  • Privacy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly