Wednesday, September 17, 2025
Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home Diario de Avisos

There is only one kilometer left to complete the largest tunnel in the Canary Islands

February 4, 2023
in Diario de Avisos
Reading Time: 3 mins read
0
There is only one kilometer left to complete the largest tunnel in the Canary Islands
6
SHARES
Share on FacebookShare on Twitter


The president of the Government of the Canary IslandsYesterday, Ángel Víctor Torres, and the Minister of Public Works, Sebastián Franquis, paid a visit to the western closure section of the Tenerife Island Ring, between Santiago del Teide and El Tanque.

It was advanced that the tunnel works They are 80% finished on the inside (one kilometer would remain) and 45% on the outside, pending a new modification of the project to build two lanes in each direction, instead of one, on the outer roads.

In addition, the possibility was left open, in the future, that the tunnel -now 14 meters wide, with a siding every kilometer- could have three lanes in each direction.

The president and the counselor, together with the delegate of the Government in the Canary Islands, Anselmo Pestana; the president of the Cabildo de Tenerife, Pedro Martín; the mayoress of El Tanque, Esther Morales Sánchez, and of Los Silos, María Macarena Fuentes Socas, and the mayor of Santiago del Teide, Emilio Navarro, accompanied by the general director of Road Infrastructure of the Canary Islands Government, José Luis Delgado, verified the state of of the work, which is being carried out both outside and inside the Erjos double tunnel, the largest (5.1 kilometres) currently being built in Spain.

It has a budget of more than 240 million euros, which has now risen to 256, due to the increase in the prices of materials and an execution period of 48 months, which should be completed in November and which, due to a change in the project, will be delayed until March 2025, after the start of the work on November 25, 2019. The delay is also due to an environmental change in the north, so as not to affect an area of ​​laurisilva, recently resolved.

The Cabildo, in addition, has set up two nurseries, with more than 3,000 Canary Island pines, to replant those affected areas in the vicinity of the great tunnel.
As stated yesterday, it is very likely that the two drillings (north and south) will be communicated before the summer, noting that they are drilling about eight meters a day, with greater difficulty in the north, as more basalt is found, recalled José Luis Slim.

The Canarian president stressed that of the 16 road projects committed in the agreement for the island of Tenerife, a total of 13 are already in execution or committed, with the recent approval of the DIA for the section between Icod and San Juan de la Rambla, as well as for the La Laguna variant.

“In the face of words and stories, we show actions and data, and that is what citizens want: governments that solve problems, and many of us have solved them, such as that highway agreement and this work on the largest tunnel in the Islands.” He explained that the Ministry of Public Works has paid work certifications worth 104.7 million, 45% of the initial budget. In addition, Torres recalled that on November 11, 2019, he signed the tunnel work decree a few days after the EIA (Environmental Impact Declaration) expired.

One before and one after

The president of the Cabildo, Pedro Martín, assured that “this work marks a before and after in the communications of the north and south of the Island”, and announced that “in 2023 the start of two other works will be published that will represent a transcendental change on the roads and will undoubtedly help to solve the traffic problem we have on the TF-5, such as those from Icod de los Vinos to San Juan de la Rambla, and the section of the TF-5 that it goes from Guamasa to the lower part of La Laguna, which have already approved the environmental impact statement”.

This work directly employs 102 workers, almost all from northern Spain, including operators and specialized personnel who work three eight-hour shifts, seven days a week. This work also indirectly employs another 204 workers, including suppliers, drivers or restaurant personnel who serve the workers.



Source link

Related Posts

From ‘False Cathedrals’ to Temples Attacked by Pirates
Diario de Avisos

From ‘False Cathedrals’ to Temples Attacked by Pirates

September 16, 2025
Tragedy on a Canary Island Beach: Death Occurs Despite Rescue Efforts
Diario de Avisos

Tragedy on a Canary Island Beach: Death Occurs Despite Rescue Efforts

September 16, 2025
The Excitement for Cristo Fills the Streets of La Laguna
Diario de Avisos

The Excitement for Cristo Fills the Streets of La Laguna

September 14, 2025
No Result
View All Result

Latest Blog Articles

  • Blog
Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

3 days ago
El Médano: A Hidden Gem for Windsurfing Enthusiasts

El Médano: A Hidden Gem for Windsurfing Enthusiasts

6 days ago
Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

6 days ago
Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

6 days ago
Sun, Sand, and Serenity: Your Guide to Los Cristianos Beach

Sun, Sand, and Serenity: Your Guide to Los Cristianos Beach

1 week ago
Tenerife’s Hidden Gems: The Enchantment of Black Sand Beaches

Tenerife’s Hidden Gems: The Enchantment of Black Sand Beaches

2 weeks ago
No Result
View All Result

News Highlights

Government Completes Process to Relocate Migrant Minors Arriving During Emergency

Tenerife Casinos Launches New “Racing Zone Canarias” in Santa Cruz

La Laguna Unveils Innovative, Tech-Driven, and Safer Taxi Regulation

Iker Casillas’ Emotional Trauma with Tenerife: “I Wept Profusely That Summer”

Tenerife’s Cabildo States It Will Not Host La Vuelta 2026 If It Harms “The Island’s Image”

IDAYLÍ Lingerie and Swimwear Boutique Celebrates 36th Anniversary

Trending News

Tenerife Looks to the Azores for Geothermal Development in the Canaries
Atlantico

Tenerife Looks to the Azores for Geothermal Development in the Canaries

by Admin
September 17, 2025
0

Canarian Consortium Explores Geothermal Development in Azores A delegation from the public-private consortium Geothermal Energy of the...

‘Basketball for Teenagers’ Arrives at CEIP Camino de la Villa

‘Basketball for Teenagers’ Arrives at CEIP Camino de la Villa

September 17, 2025
Santa Úrsula Feels Overlooked on the Northern Motorway

Santa Úrsula Feels Overlooked on the Northern Motorway

September 17, 2025
Government Completes Process to Relocate Migrant Minors Arriving During Emergency

Government Completes Process to Relocate Migrant Minors Arriving During Emergency

September 17, 2025
Tenerife Casinos Launches New “Racing Zone Canarias” in Santa Cruz

Tenerife Casinos Launches New “Racing Zone Canarias” in Santa Cruz

September 17, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Canarian News
  • Privacy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly