Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home Diario de Avisos

The Erjos tunnel is 80% finished and will open in March 2025

February 3, 2023
in Diario de Avisos
Reading Time: 2 mins read
0
The Erjos tunnel is 80% finished and will open in March 2025
11
SHARES
Share on FacebookShare on Twitter


The President of the Government of the Canary Islands, Ángel Víctor Torres, and the Minister of Public Works, Transport and Housing, Sebastián Franquis, made a visit this Friday to supervise the state of the works that the Ministry is carrying out in the section of the western closure of the Insular Ring of Tenerife, between Santiago del Teide and El Tanque.

Progress was made that the tunnel works are 80% finished on the inside (one kilometer would remain) and 45% on the outside, pending a new modification of the project to build two lanes in each direction, instead of one, in the outer pathways.

The president and the counselor, along with the Government delegate in the Canary Islands, Anselmo Pestana, the president of the Cabildo de Tenerife, Pedro Martín, the mayoress of El Tanque, Esther Morales Sánchez, and of Los Silos, María Macarena Fuentes Socas, and the mayor from Santiago del Teide, Emilio José Navarro Castanedo, accompanied by the Director General of Road Infrastructure of the Canary Islands Government, José Luis Delgado, checked the status of the work being carried out both outside and inside the Erjos double tunnel, the largest (5.1 kilometres) that is currently being built in Spain, with a budget of more than 240 million euros, which has now risen to 256, and an execution period of 48 months that should be completed in November and which, due to the modified will be delayed until 2025, after the start of the work in 2019.

However, as was said this Friday, it is very likely that the two drillings (north and south) will be communicated before the summer, noting that they are drilling about eight meters a day, with greater difficulty in the north, when finding more basalt, José Luis Delgado recalled before President Torres, who highlighted the commitment to “the mobility of this Government”, something that Pedro Martín also had an impact on, highlighting that “the projects to complete the insular ring road are already drawn up”, when also speaking of the section from Icod de los Vinos to Los Realejos, it being expected that all these works, together with the extension of the TF-1 from Arafo to Adeje, will be completed in this decade.

Ángel Víctor Torres ended by saying: “They are not words, they are actions; They are facts, not promises.



Source link

Related Posts

No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife
Diario de Avisos

No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife

July 11, 2025
The Aemet forecasts the weather in the Canaries this Friday: particular focus on two phenomena
Diario de Avisos

The Aemet forecasts the weather in the Canaries this Friday: particular focus on two phenomena

July 11, 2025
The Big Deal Isn’t the Car
Diario de Avisos

The Big Deal Isn’t the Car

July 9, 2025
No Result
View All Result

Click Image to Join Community

Tenerife Forum Community

Previous News

Torres highlights the Highway Agreement as an example that the PSOE is the party that “solves” the problems

Torres highlights the Highway Agreement as an example that the PSOE is the party that “solves” the problems

2 years ago
The Canary Islands Government will seal the illegal landfill in the Casa Pedro Alonso area

The Canary Islands Government will seal the illegal landfill in the Casa Pedro Alonso area

4 years ago
Carnival shines under the sun in Candelaria and Granadilla

Carnival shines under the sun in Candelaria and Granadilla

2 years ago
Explosion of contagions in Santa Cruz: one in 25 chicharreros has COVID

Explosion of contagions in Santa Cruz: one in 25 chicharreros has COVID

4 years ago
Voices of Home Care Workers in Santa Cruz de Tenerife

Voices of Home Care Workers in Santa Cruz de Tenerife

3 months ago
The seven lives of the Rambla de Castro

The seven lives of the Rambla de Castro

2 years ago
No Result
View All Result

News Highlights

A Estate, a Saint, and a Pilgrimage (Part III). By Julio Torres Santos

No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife

A union denounces the alteration of customs officers’ shifts as malpractice.

The Convent of Santo Domingo Opens Its Doors to the ‘Spaces of the Canaries’

The Mediator Judge will send the solar panel case to the Court for a Jury.

A man in critical condition after being revived from a cardiac arrest in Candelaria.

Trending News

Canaries loses its traditional pubs
Atlantico

Canaries loses its traditional pubs

by Admin
July 12, 2025
0

Costly burdens, a lack of generational succession and transformations in social habits are driving traditional bars in...

The Cabildo to Provide Work Placements for 450 ULL Students in the 2025-2026 Academic Year

The Cabildo to Provide Work Placements for 450 ULL Students in the 2025-2026 Academic Year

July 12, 2025
The Magician’s Dance Brings Together 12,000 People Around 700 Tables

The Magician’s Dance Brings Together 12,000 People Around 700 Tables

July 12, 2025
A Estate, a Saint, and a Pilgrimage (Part III). By Julio Torres Santos

A Estate, a Saint, and a Pilgrimage (Part III). By Julio Torres Santos

July 12, 2025
No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife

No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife

July 11, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Guide
  • Adobe
  • Linkedin
  • Privacy Policy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly