Friday, September 19, 2025
Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home El Dia

The new purification system of the Valle de La Orotava will reduce discharges into the subsoil

January 31, 2023
in El Dia
Reading Time: 3 mins read
0
The new purification system of the Valle de La Orotava will reduce discharges into the subsoil
3
SHARES
Share on FacebookShare on Twitter



The new purification system of the Valle de La Orotava will reduce discharges into the subsoil

The new purification system La Orotava Valleywhose collectors are already being built thanks to the agreement of the Council of Tenerife with the state company acuaeswill be completed with the construction of a new treatment plant in Punta Bravain the municipality of Cross port“which will significantly reduce the discharge of wastewater into the subsoil in the Valley and will produce reclaimed water for agricultural use», according to the insular Government. The Councilor for Sustainable Development and the Fight Against Climate Change of the Cabildo, javier rodriguezvisited this Monday, January 30, the existing treatment plant, which processes 6,800 cubic meters of wastewater per day, and recalled that with the new system “triple can be treated”.

The current treatment plant receives water from Cross portLos Realejos and La Orotavathe three most populous municipalities in the North, where some 110,000 people reside and there are more than 20,000 hotel and non-hotel beds. The increase in population in recent years and the passage of time itself condition the operation of this Industrial water treatmentwhich is intended to be renovated in two phases.

“This is a particularly important system for the island as a whole. in the valley of the orotava currently there is a capacity of 6,800 cubic meters per dayand we are aware that this treatment plant must be expanded because we are executing works to be able to treat and recover the water that is generated in the nuclei of the Valley and that right now is going underground, “warns Rodríguez.

The planned investment exceeds 34 million euros

The new sewage treatment plant of the La Orotava Valley Upon completion, it will process 20,000 cubic meters of water per day or, in other words, “triple what it is currently treating.” Rodríguez Medina stressed the importance of the project that is underway during the visit to the current treatment plant together with the mayor of Puerto de la Cruz, Marco González (PSOE). He stressed that once the work on the regional collectors is finished “a greater volume of water will arrive, so we want to lighten the construction deadlines for the new plant as much as possible. We already have the project to expand this treatment plant and what we want is that it can be executed as quickly as possible».

Visit to the Valle de La Orotava treatment plant tomas rodriguez


Marco Gonzalez He added that “it is very important for the city that the integral water cycle is a reality, after many years purifying water but without reaching the point we wanted. The goal of Island Water Council Tenerifethe Cabildo and the City Council is clear: to be able to execute these two expansion phases of this treatment plant, so we are going to continue taking all the necessary administrative steps to get it up and running.

Since March 2022, works are being carried out on main collectors, especially in La Orotava and Los Realejos, which are the most deficient areas in the sanitation network. Some works budgeted at more than 12.5 million euros. The project for the new treatment plant, whose drafting has cost 188,251 euros, contemplates the execution in two phases. In the first phase it will be treated with technology Membrane BioReactor (MBR), a flow of 10,000 cubic meters per day of wastewater. A flow equivalent to that of some 90,000 inhabitants. This first phase will cost 21,521,000 euros and requires 24 months of execution. The second phase will complete wastewater treatment by adding another 10,000 cubic meters a day. In addition, it will contemplate the tertiary treatment of purified water through reversible electrodialysiswhich will allow them to be reused for agricultural irrigation and other uses.



Source link

Related Posts

The Fate of the Suspects in the Belgian Couple’s Murder in Tenerife Lies with the Jury
El Dia

The Fate of the Suspects in the Belgian Couple’s Murder in Tenerife Lies with the Jury

September 19, 2025
Tenerife Carnival: Discover All Events at Puerto de la Cruz Summer Carnival
El Dia

Tenerife Carnival: Discover All Events at Puerto de la Cruz Summer Carnival

September 19, 2025
Prison Officials Feel Targeted by the Home Office
El Dia

Prison Officials Feel Targeted by the Home Office

September 18, 2025
No Result
View All Result

Latest Blog Articles

  • Blog
Dolphin Encounters in Tenerife: A Journey Through the Waves

Dolphin Encounters in Tenerife: A Journey Through the Waves

1 day ago
Why Tenerife Could Be the Surprise Winner as American Tourism Takes a Hit

Why Tenerife Could Be the Surprise Winner as American Tourism Takes a Hit

1 day ago
Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

4 days ago
El Médano: A Hidden Gem for Windsurfing Enthusiasts

El Médano: A Hidden Gem for Windsurfing Enthusiasts

1 week ago
Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

1 week ago
Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

1 week ago
No Result
View All Result

News Highlights

Only 33% of Santa Cruz Shops Have Parking Within 50 Metres

Ryanair Announces Layoff of Over 100 Ground Staff at Santiago Airport

La Laguna Prepares for the Final Cultural, Sporting, and Religious Events of the 2025 Cristo Festival

CaixaBank Dualiza Launches the Dualiza Call for Canary Islands Vocational Training Centres in Tenerife

PSOE=Devil: Two Suspects Released and Judicial Silence

Ez Property Solutions Chief to Civil Guard Who Arrested Him: “Sewer Rat”

Trending News

Canarias to Experience a Brief Relief from Heat This Saturday, but High Temperatures and Dust Shall Persist
Atlantico

Canarias to Experience a Brief Relief from Heat This Saturday, but High Temperatures and Dust Shall Persist

by Admin
September 19, 2025
0

Warm Weather to Provide a Brief Respite for the Canary Islands Temperature Trends This Weekend The recent...

Uncontrolled Fires Threaten Villages in Lugo and Ourense, Prompting UME Response

Uncontrolled Fires Threaten Villages in Lugo and Ourense, Prompting UME Response

September 19, 2025
The Fate of the Suspects in the Belgian Couple’s Murder in Tenerife Lies with the Jury

The Fate of the Suspects in the Belgian Couple’s Murder in Tenerife Lies with the Jury

September 19, 2025
Only 33% of Santa Cruz Shops Have Parking Within 50 Metres

Only 33% of Santa Cruz Shops Have Parking Within 50 Metres

September 19, 2025
Ryanair Announces Layoff of Over 100 Ground Staff at Santiago Airport

Ryanair Announces Layoff of Over 100 Ground Staff at Santiago Airport

September 19, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Canarian News
  • Privacy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly