Wednesday, September 17, 2025
Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home Diario de Avisos

The municipalities in the South of Tenerife with the largest population are facing a key year in works

January 31, 2023
in Diario de Avisos
Reading Time: 3 mins read
0
The municipalities in the South of Tenerife with the largest population are facing a key year in works
4
SHARES
Share on FacebookShare on Twitter


The three most populous municipalities in the South are facing a year marked by large projects to facilitate mobility, improve safety and reinforce their commitment to environmentally friendly infrastructures.
In terms of security, Arona will reform the Los Cristianos office, located next to the cultural center.

The facilities, which will open this year, will be modernized and will have more material resources. The expected 20 security cameras will also be awarded and placed in the area of the veronicas (Playa de Las Americas). But the star project in the medium term involves the construction of the new Citizen Security building in Cho-Parque La Reina, the future headquarters of the Local policewhose location, next to the motorway, will allow a greater speed of police actions.

Granadilla de Abona is also committed to a new Local Police station that will begin to be built this year. The project, already drafted, contemplates a building on an area of ​​1,221 square meters at the intersection of Fundador Gonzalo González avenue, at the TF-64 crossing, with La Cima passage.

The new building will have a capacity for at least 150 people, including police officers, workers and operators, and will include, among other facilities, garages, a gym, a cell area and a training area.

Adeje will begin the final phase of the Productive Forest and the Central Park, with the adjacent building that will house a market and various spaces for public enjoyment and use.

It is a pioneering project in the South distributed over more than 30,000 square meters that will bring together 25,000 plant, fruit, ornamental, aromatic and medicinal species.

It is the great environmental commitment of a municipality that also stands out, in terms of sustainability, for the first local energy community to supply itself with sun through photovoltaic panels, together with an ambitious plan for greenways that will link the tourist Adeje with the historic Adeje and that will include energy saving and efficiency measures.

The initiative contemplates new infrastructures and roads to ease the mobility of vehicles and pedestrians. It includes a pedestrian bridge with a bike lane that will link Fañabé with the entrance to Adeje. There are also planned structuring roads that will connect the coastal area.

The most outstanding project in terms of mobility in Arona will be the connection routes between the port of Los Cristianos and the TF-1 motorway. The State has included a game of five million euros to promote the initial phase of the works. Likewise, with funds from the Cabildo, the pavement of the roads of Guargacho, Valle San Lorenzo-La Camella, the TF-653 and the TF-662 will be rehabilitated.

The largest municipality in population in the South will receive 12.5 million euros from the Cabildo budget to, in addition to resurfacing roads, carry out projects such as the coastal path and the adaptation of Las Vistas promenade. The State will also allocate two million to regenerate Los Cristianos Bay and Los Tarajales beach, one of the most anticipated actions for decades.

other performances

Adeje wants to take the first tangible steps in its star sports project: the construction of a municipal stadium. Arona intends to promote the first rehabilitation of public housing in the municipality, specifically in the Virgen del Carmen de Guargacho urbanization, while Granadilla will put out to tender this year the construction of a functional home and day center in San Isidro, a nucleus in which 30,000 reside people and that this year will also see the opening of the Farmer’s Market on a plot of 8,000 square meters in La Jurada.



Source link

Related Posts

From ‘False Cathedrals’ to Temples Attacked by Pirates
Diario de Avisos

From ‘False Cathedrals’ to Temples Attacked by Pirates

September 16, 2025
Tragedy on a Canary Island Beach: Death Occurs Despite Rescue Efforts
Diario de Avisos

Tragedy on a Canary Island Beach: Death Occurs Despite Rescue Efforts

September 16, 2025
The Excitement for Cristo Fills the Streets of La Laguna
Diario de Avisos

The Excitement for Cristo Fills the Streets of La Laguna

September 14, 2025
No Result
View All Result

Latest Blog Articles

  • Blog
Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

2 days ago
El Médano: A Hidden Gem for Windsurfing Enthusiasts

El Médano: A Hidden Gem for Windsurfing Enthusiasts

5 days ago
Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

5 days ago
Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

5 days ago
Sun, Sand, and Serenity: Your Guide to Los Cristianos Beach

Sun, Sand, and Serenity: Your Guide to Los Cristianos Beach

1 week ago
Tenerife’s Hidden Gems: The Enchantment of Black Sand Beaches

Tenerife’s Hidden Gems: The Enchantment of Black Sand Beaches

2 weeks ago
No Result
View All Result

News Highlights

Completion of Submarine Cable Installation for La Gomera and Tenerife Interconnection

National Court Sentences Arbistar Leader to Eight Years for €200 Million Cryptocurrency Fraud

No está en Tenerife: el pueblo más pobre de Canarias con una renta media familiar de 16.997 €

Festival Boreal Reveals Performance Timings for Its 18th Edition

Granadilla and San Isidro Connect Towns with Urban Bus Services

Disa Pauses Development of Green Hydrogen Plant in Tenerife

Trending News

Iker Casillas’ Emotional Trauma with Tenerife: “I Wept Profusely That Summer”
Atlantico

Iker Casillas’ Emotional Trauma with Tenerife: “I Wept Profusely That Summer”

by Admin
September 17, 2025
0

Casillas Reflects on Football Trauma Linked to Tenerife Some defeats carry more weight than the titles won....

Tenerife’s Cabildo States It Will Not Host La Vuelta 2026 If It Harms “The Island’s Image”

Tenerife’s Cabildo States It Will Not Host La Vuelta 2026 If It Harms “The Island’s Image”

September 17, 2025
IDAYLÍ Lingerie and Swimwear Boutique Celebrates 36th Anniversary

IDAYLÍ Lingerie and Swimwear Boutique Celebrates 36th Anniversary

September 17, 2025
Completion of Submarine Cable Installation for La Gomera and Tenerife Interconnection

Completion of Submarine Cable Installation for La Gomera and Tenerife Interconnection

September 17, 2025
National Court Sentences Arbistar Leader to Eight Years for €200 Million Cryptocurrency Fraud

National Court Sentences Arbistar Leader to Eight Years for €200 Million Cryptocurrency Fraud

September 17, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Canarian News
  • Privacy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly