Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home El Dia

A project of 9 million to order the square and surroundings of Puerto de Santiago

September 4, 2022
in El Dia
Reading Time: 4 mins read
0
A project of 9 million to order the square and surroundings of Puerto de Santiago
15
SHARES
Share on FacebookShare on Twitter



A project of 9 million to order the square and surroundings of Puerto de Santiago

Santiago del Teide is facing «a project to renaturalize the space with which we intend not only to legalize the situation of the square, but to return that strip of the coast to its natural state, ”explains the mayor of the municipality, Emilio Navarro. He talks about the project for the plaza and surroundings of Puerto de Santiago, an area for which “a competitive solution is designed, which meets the standards of tourism quality and sustainability required by regional, national and international financing programs.”

The scope of action has Approximate area of ​​10,000 square meters and five actions are proposed: the vertical connection with the traditional nucleus; the regeneration of the slope with endemic vegetation, water collectors and design of vertical connection itineraries; the redesign of the plaza, incorporating an underground car park (with 200 parking spaces distributed over two floors) and a modal exchange area with the Puerto de los Gigantes-Plaza de Santiago coastal connection shuttle; the projection of a free space that incorporates public facilities such as kiosks, tourist offices, etc.; and the adaptation of the existing cove as a bathing area.

The resulting new multifunctional and urban space will accommodate the activities and needs not only of the residents, but will also enrich the tourist offer. To do this, a large square is proposed as a connecting element between the urban fabric and the coast, which in addition to articulating, structuring and ordering the activities and uses of the place, will connect –as far as possible– this new space with the existing ones, generating a boardwalk.

It is available an interchange at the level of the avenue, for the arrival and departure of visitors in buses, taxis, bicycles and pedestrians. Likewise, a new two-storey underground car park will be built, occupying the current section of the road and solving the need for car parks.

The basic project, which the Santiago del Teide City Council already has, articulates integrated facilities for the square and green areas: public facilities, such as kiosks and tourist offices, as well as small shopping areas linked to leisure and restaurants.

A project of 9 million to order the square and surroundings of Puerto de Santiago


The construction.

The projected building on three levels «could recall the natural forms of the volcanic flows of the Island in contact with the sea». The first level, the one on the upper level, is the one that “solves the problem of parking, the real opening of a maritime front that adequately links the environment and that invites you to walk and stay”.

The second level, the intermediate level, facilitates the recovery of the coastline including underground parking, which frees up the upper level of automobiles, as well as a large area where all kinds of events can be held, just as it happens today. Between both uses, a line of shops is introduced that will guarantee the activity and complement the needs of the environment.

The third level, the one on the lower level, is the transition space between what is built and the sea. For this, some areas of stay are generated for the use of the bather as well as an accessibility to the beach, currently almost in disuse.

A project of 9 million to order the square and surroundings of Puerto de Santiago


connectivity.

The Avenida Marítima will have only one roundabout lane at this level, with traffic regulation exclusively for public transport (taxis), emergency vehicles and residents accessing their garages. To this end, the road will be reduced to a one-way south-north direction towards Los Gigantes and traffic will be diverted creating a ring through Antonio González Barrios and Caleta Jurado streets, in front of the Puerto Santiago square, transforming it into a large one-way street, reducing the section of the road and eliminating surface parking.

The coast.

The intended coastal regeneration ranges from Puerto de Santiago to La Hondura. The recovery of the coves for public use, promoting pedestrian traffic and the enjoyment of people, the reconstruction of the lava flows of the place to facilitate the passage of people, preparing small platforms for connection with the sea for their enjoyment and use of the views of this waterfront is the purpose in this matter. In fact, it is proposed to dredge the ravine because this would bring the sea closer to the town.

The estimated budget for this work amounts to 9,132,500 euros. Emilio Navarro understands that “we are facing a project of great importance for the municipality and its economy and for its impact on the revaluation of our tourist area.”



Source link

Related Posts

The Magician’s Dance Brings Together 12,000 People Around 700 Tables
El Dia

The Magician’s Dance Brings Together 12,000 People Around 700 Tables

July 12, 2025
SAN FERMINES TENERIFE | A neighbourhood in Tenerife kicks off the ‘txupinazo’ and celebrates its own bull run for San Fermín
El Dia

SAN FERMINES TENERIFE | A neighbourhood in Tenerife kicks off the ‘txupinazo’ and celebrates its own bull run for San Fermín

July 11, 2025
Fepeco and Güímar Explore Solutions for Public Housing
El Dia

Fepeco and Güímar Explore Solutions for Public Housing

July 11, 2025
No Result
View All Result

Click Image to Join Community

Tenerife Forum Community

Previous News

Iconic Continental Watchmaker Closes Doors After 60 Years on Castillo Street

Iconic Continental Watchmaker Closes Doors After 60 Years on Castillo Street

10 months ago
Sí Podemos rejects the Cabildo’s budget and says that the PSOE shows its “true face by agreeing with the right”

Sí Podemos rejects the Cabildo’s budget and says that the PSOE shows its “true face by agreeing with the right”

3 years ago
Los Realejos’ budget grows by 4% and exceeds 31 million euros

Los Realejos’ budget grows by 4% and exceeds 31 million euros

4 years ago
The restaurant that wanted to play Tetris with its customers

The restaurant that wanted to play Tetris with its customers

3 years ago
Caution to ‘Támara’ Regarding the Promotion

Caution to ‘Támara’ Regarding the Promotion

2 months ago
Friday Festivities Honor the Patroness of the Canary Islands in Candelaria

Friday Festivities Honor the Patroness of the Canary Islands in Candelaria

1 year ago
No Result
View All Result

News Highlights

Canaries loses its traditional pubs

The Cabildo to Provide Work Placements for 450 ULL Students in the 2025-2026 Academic Year

The Magician’s Dance Brings Together 12,000 People Around 700 Tables

A Estate, a Saint, and a Pilgrimage (Part III). By Julio Torres Santos

No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife

A union denounces the alteration of customs officers’ shifts as malpractice.

Trending News

The Canarian Beach Bar with Sea Views Recognised by the Repsol Guide: “Fresh Fish”
Atlantico

The Canarian Beach Bar with Sea Views Recognised by the Repsol Guide: “Fresh Fish”

by Admin
July 12, 2025
0

The sun gently sets over the coast, the sound of the sea lulls the downtime, and the...

Three New Multisport Facilities in Santa Cruz de Tenerife, La Laguna, and Arona

Three New Multisport Facilities in Santa Cruz de Tenerife, La Laguna, and Arona

July 12, 2025
Tram workers report that there are still traces of silica sand on the tracks and in the depots.

Tram workers report that there are still traces of silica sand on the tracks and in the depots.

July 12, 2025
Canaries loses its traditional pubs

Canaries loses its traditional pubs

July 12, 2025
The Cabildo to Provide Work Placements for 450 ULL Students in the 2025-2026 Academic Year

The Cabildo to Provide Work Placements for 450 ULL Students in the 2025-2026 Academic Year

July 12, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Guide
  • Adobe
  • Linkedin
  • Privacy Policy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly