Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home El Dia

The Cabildo de Tenerife begins to cover the side of the Martiánez tunnel

June 9, 2022
in El Dia
Reading Time: 2 mins read
0
The Cabildo de Tenerife begins to cover the side of the Martiánez tunnel
6
SHARES
Share on FacebookShare on Twitter



The Cabildo de Tenerife begins to cover the side of the Martiánez tunnel

The Council of Tenerifethrough the Roads area, begins the works for the installation of cladding on the lateral walls of the existing cut-and-cover tunnel on the TF-31 road, between kilometer points 2,600 and 4,100, the one known as the Martiánez tunnel, in Puerto de la Cruz. The intervention has a budget of 134,217 euros and the island government expects it to be completed during the first half of July.

The First Vice President and Island Councilor for Roads, Enrique Arriaga, details that «The action that begins this week includes the lining on the sides of the cut-and-cover tunnel, which will also increase safety in this section of the TF-31». In his analysis, he states that “it also provides a more aesthetic and hygienic finish by making it easier to clean.”

The Island Director of Highways, Tomás Félix García, explains that the cover will be made up of two white lacquered aluminum panels, separated by a polyethylene core, placed on a galvanized steel metal structure anchored to the concrete walls of the cut-and-cover tunnel. In the case of the wall located on the sea side, which has holes in its structure to allow light to pass through, the panels will be cut to size, adapting them to the shape of the wall between these holes.

In order to carry out the coating work safely, the work will be carried out during daylight hours, so traffic will be affected. The entrance to Puerto de la Cruz through this road will be through the La Paz urbanization. At the same time, circulation is maintained in the outgoing direction.

These works fall within the different conservation and maintenance actions carried out by the Cabildo on the different island roads.

It should be remembered that the insular area of ​​Highways invested 100,000 euros in asphalting the interior of the Martiánez tunnel, one of the main accesses to the city of Puerto de la Cruz. This section of the TF-31 insular highway, also known as the Eastern highway, has more than 300 linear meters. Said work corrected the terrible state in which this road was found, due to the intense traffic it registers and “due to the continuous potholes” applied during the preceding years, according to the Cabildo itself.



Source link

Related Posts

Ana Dorta re-elected as General Secretary of CC in Guía de Isora
El Dia

Ana Dorta re-elected as General Secretary of CC in Guía de Isora

July 13, 2025
The Patroness of Sailors Returns to the Sea in Candelaria
El Dia

The Patroness of Sailors Returns to the Sea in Candelaria

July 13, 2025
A large green space of 35,000 square metres in Adeje to combat pollution.
El Dia

A large green space of 35,000 square metres in Adeje to combat pollution.

July 12, 2025
No Result
View All Result

Click Image to Join Community

Tenerife Forum Community

Previous News

Documentary falsification in a sanitation work in Güímar

Documentary falsification in a sanitation work in Güímar

1 year ago
The works of the Llano del Camello Health Center have been stopped for two years

The works of the Llano del Camello Health Center have been stopped for two years

4 years ago
Tenerife will have the largest film sets in Europe

Tenerife will have the largest film sets in Europe

2 years ago
The complaint filed against Luis Yeray Gutiérrez and several of his councilors by the defecting councilor Alfredo Gómez is archived

The complaint filed against Luis Yeray Gutiérrez and several of his councilors by the defecting councilor Alfredo Gómez is archived

2 years ago
Three out of four people cared for by the Canary Islands Employment Service endorse the care received

Three out of four people cared for by the Canary Islands Employment Service endorse the care received

2 years ago
The Cabildo of Tenerife requests a loan of 60 million for “necessary works”

The Cabildo of Tenerife requests a loan of 60 million for “necessary works”

4 years ago
No Result
View All Result

News Highlights

Ana Dorta re-elected as General Secretary of CC in Guía de Isora

A cyclist suffers a heart attack after crossing the finish line of a race in Tenerife: “He had to be revived by another competitor”

Chicharreros are increasingly separating organic waste to create compost.

An ECOAQUA Investigation Provides Innovative Solutions for Public Aquariums

An adult and a minor injured after a vehicle collision in Santa Cruz de Tenerife

Injuries to a Man and a Minor in an Accident at Barranco de Santos in Tenerife’s Capital

Trending News

La Laguna deploys a special cleaning operation for the San Benito Pilgrimage.
La Laguna

La Laguna deploys a special cleaning operation for the San Benito Pilgrimage.

by Admin
July 13, 2025
0

The Council of La Laguna will launch a special operation with 60 workers and specific machinery to...

Head Injury from Rock Fall on Remote Beach in Santa Úrsula

Head Injury from Rock Fall on Remote Beach in Santa Úrsula

July 13, 2025
Oriol Romeu’s Favourite Canary Island Restaurant: In a Quaint Traditional White House

Oriol Romeu’s Favourite Canary Island Restaurant: In a Quaint Traditional White House

July 13, 2025
Ana Dorta re-elected as General Secretary of CC in Guía de Isora

Ana Dorta re-elected as General Secretary of CC in Guía de Isora

July 13, 2025
A cyclist suffers a heart attack after crossing the finish line of a race in Tenerife: “He had to be revived by another competitor”

A cyclist suffers a heart attack after crossing the finish line of a race in Tenerife: “He had to be revived by another competitor”

July 13, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Guide
  • Adobe
  • Linkedin
  • Privacy Policy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly