Saturday, September 20, 2025
Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home El Dia

A new plant for the Tenerife Environmental Complex will avoid burying 76,000 tons of organic waste per year

March 4, 2022
in El Dia
Reading Time: 3 mins read
0
A new plant for the Tenerife Environmental Complex will avoid burying 76,000 tons of organic waste per year
4
SHARES
Share on FacebookShare on Twitter



A new plant for the Tenerife Environmental Complex will avoid burying 76,000 tons of organic waste per year

The new biostabilization plant for the Tenerife Environmental Complex It will treat, from now on, more than 76,000 tons of waste each year after updating the facilities, thus avoiding that the garbage has to be buried.

The President of the Council, Peter Martintogether with the director of the Area of ​​Sustainable Development and the Fight against Climate Change, Javier Rodríguez Medina, visited this Friday the facilities of the biostabilization plant, “which were in a dilapidated state and with production stopped since 2018”.

The president indicated that the council “has invested more than 1.5 million euros in fine-tuning this facility to be able to start it up again and stop burying a large amount of waste that can later be used for some uses in agriculture, gardening or road maintenance , and thus avoid continuing to bury and occupy territory in Tenerife with materials that, after all, are resources or raw materials”.

Pedro Martin stressed that the reactivation of this installation is a very big advance and comes to complement other actions that are being worked on in waste management, such as the packaging plant or some new initiatives in which private companies will come to give garbage a new opportunity, as is the case of the award of another plot in the complex for the installation of recycling industries in Tenerife.

“This is the start and with it we make it easier for municipalities to implement the fifth container,” said Pedro Martín, who recalled that in the case of Santa Cruz and Granadilla there are already pilot projects for buckets only for organic matter. In addition, he reinforced the idea that if organic matter is collected at source, the environmental impact generated by garbage will be reduced. “But for this we need the strong support of the municipalities,” he added.

For his part, Javier Rodríguez pointed out that one of the priority objectives of the Island Corporation, in terms of waste management, was to reactivate this plant, since “it makes no sense that a territory with a vocation for conservation is allowing itself a break energy such as burying waste that can be recovered and converted into resources”.

“We live with a technological development that allows us to give rise to the circular economy, and we are committed to that path, and the start-up of this plant is an example of it, that of reactivating a warehouse that had been closed since 2018 due to structural pathologies” , he added.

The biostabilization plant will be able to treat 76,000 tons/year of organic matter from the gray container, which will generate a biostabilized material with application in improving the structure of agricultural soils, gardening, slope conservation, etc., which translates into approximately 6,300 tons per month, which when passing through this plant will no longer be buried in the discharge cells.

The improvement work that has been carried out has cost 1,189,760 euros and the intervention consisted of dismantling the existing structures, including the roofs and replacing the enclosures with new ones; reinstallation of water distribution pipes; reinstallation of electrical panels; reinstallation of ventilation ducts; signs; installation of a booth for the office and installation of fire extinguishing systems.



Source link

Related Posts

Weekend Activities in Tenerife: A Comprehensive Guide
El Dia

Weekend Activities in Tenerife: A Comprehensive Guide

September 20, 2025
The Fate of the Suspects in the Belgian Couple’s Murder in Tenerife Lies with the Jury
El Dia

The Fate of the Suspects in the Belgian Couple’s Murder in Tenerife Lies with the Jury

September 19, 2025
Tenerife Carnival: Discover All Events at Puerto de la Cruz Summer Carnival
El Dia

Tenerife Carnival: Discover All Events at Puerto de la Cruz Summer Carnival

September 19, 2025
No Result
View All Result

Latest Blog Articles

  • Blog
Dolphin Encounters in Tenerife: A Journey Through the Waves

Dolphin Encounters in Tenerife: A Journey Through the Waves

2 days ago
Why Tenerife Could Be the Surprise Winner as American Tourism Takes a Hit

Why Tenerife Could Be the Surprise Winner as American Tourism Takes a Hit

2 days ago
Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

5 days ago
El Médano: A Hidden Gem for Windsurfing Enthusiasts

El Médano: A Hidden Gem for Windsurfing Enthusiasts

1 week ago
Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

1 week ago
Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

1 week ago
No Result
View All Result

News Highlights

A New Fire in A Fonsagrada Raises the Total to Three Active Blazes in Galicia

Spain’s First Volcanic Eruption Simulation Blends Science and Public Engagement in Garachico

La Laguna Engages in Informative Committees of the Spanish Cities of Heritage Group

Weekend Activities in Tenerife: A Comprehensive Guide

Her Techniques Represented a Distinct Expertise

Multiple Communities on Alert for Rain and Storms

Trending News

Tellado Calls for Minister Redondo’s Resignation Over Failures in Domestic Abuser Bracelets in Tenerife
Atlantico

Tellado Calls for Minister Redondo’s Resignation Over Failures in Domestic Abuser Bracelets in Tenerife

by Admin
September 20, 2025
0

PP Demands Immediate Resignation of Equality Minister Call for Accountability The General Secretary of the People's Party...

Summer Songs: Highlights and Memories (LXI)

Summer Songs: Highlights and Memories (LXI)

September 20, 2025
El PSOE describes the handling of Education during the heatwave in the Canary Islands as “shameful”

El PSOE describes the handling of Education during the heatwave in the Canary Islands as “shameful”

September 20, 2025
A New Fire in A Fonsagrada Raises the Total to Three Active Blazes in Galicia

A New Fire in A Fonsagrada Raises the Total to Three Active Blazes in Galicia

September 20, 2025
Spain’s First Volcanic Eruption Simulation Blends Science and Public Engagement in Garachico

Spain’s First Volcanic Eruption Simulation Blends Science and Public Engagement in Garachico

September 20, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Canarian News
  • Privacy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly