Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home Diario de Avisos

Traffic cuts on the TF-5 highway

August 22, 2021
in Diario de Avisos
Reading Time: 2 mins read
0
Traffic cuts on the TF-5 highway
4
SHARES
Share on FacebookShare on Twitter


Resource image of the TF-5.  GIVES
Resource image of the TF-5. GIVES

The Cabildo de Tenerife will proceed between the night of August 23 and the day after to resurface the section of the north highway TF-5 between Good step, on Icod de los Vinos, and Los Realejos.

The works are part of the comprehensive rehabilitation of the firm that the island corporation has been undertaking since last April on the TF-5 and which is estimated to be completed in April 2022, the Cabildo reported this Sunday in a note. The Minister of Roads, Enrique Arriaga, explains that “this very important resurfacing action” of the northern highway, for which 12 million euros have been allocated, is being carried out at night to minimize the inconvenience and risk to road users.

The rehabilitation will increase the road safety of this high-occupancy highway and will make driving more comfortable, he says. In addition, adds Arriaga, it has been arranged that a section is not started until the one that is being worked is completely completed and thus, every night, between 10 p.m. and 6 a.m., it will run almost a kilometer.

With this measure, the effect on drivers will be less, he adds. The insular director of Roads, Tomás Félix García, points out that to carry out the work between Icod de los Vinos and Los Realejos it is essential to cut a lane, allowing traffic in the free lane and with alternative circulation. This section is part of the third phase of the TF-5 road surface rehabilitation works, after work has already been carried out between Padre Anchieta and the entrance to Santa Cruz, as well as between Padre Anchieta and Los Rodeos.





Source link

Related Posts

A Santa Cruz resident films a group of youths engaged in vandalism: “They’re wrecking the area and shouting.”
Diario de Avisos

A Santa Cruz resident films a group of youths engaged in vandalism: “They’re wrecking the area and shouting.”

July 17, 2025
Fire in Tenerife: A Vast Column of Smoke Visible from Miles Away
Diario de Avisos

Fire in Tenerife: A Vast Column of Smoke Visible from Miles Away

July 17, 2025
Residents of Los Realejos at odds over the installation of a gas and fossil fuel plant 30 metres from their homes
Diario de Avisos

Residents of Los Realejos at odds over the installation of a gas and fossil fuel plant 30 metres from their homes

July 16, 2025
No Result
View All Result

Click Image to Join Community

Tenerife Forum Community

Previous News

Tenerife will host ‘EmpleArte’ for long-term unemployed youth

Tenerife will host ‘EmpleArte’ for long-term unemployed youth

3 years ago
800,000 euros so that El Sol street, in El Rosario, ceases to be the black point of the local road network

800,000 euros so that El Sol street, in El Rosario, ceases to be the black point of the local road network

3 years ago
Strict Restrictions on Irrigation Water Supply Initiated by The Cabildo in Several Towns across Tenerife

Strict Restrictions on Irrigation Water Supply Initiated by The Cabildo in Several Towns across Tenerife

1 year ago
Suspension of Tram Strike in Tenerife Following Agreement Deal

Suspension of Tram Strike in Tenerife Following Agreement Deal

1 year ago
More than 600 children participate in the II Tenerife Children’s Plan

More than 600 children participate in the II Tenerife Children’s Plan

2 years ago
The registration period in the Sectoral Council for the recovery and reconstruction of La Palma is open

The registration period in the Sectoral Council for the recovery and reconstruction of La Palma is open

2 years ago
No Result
View All Result

News Highlights

Our Lady of Mount Carmel (and III)

The tram strike committee resumes negotiations with Metropolitano de Tenerife.

Sardà and Valdano Reflect on Maturity in a CaixaBank Discussion in Tenerife

The Leal Theatre presents a musical journey for all audiences this weekend.

Unions announce new meetings to resolve the employment dispute at the Tenerife Metropolitano.

Santa Cruz closes the Las Mesas park due to wildfire risk.

Trending News

The giant Zamna reveals its lineup of artists for the upcoming launch in Tenerife.
La Laguna

The giant Zamna reveals its lineup of artists for the upcoming launch in Tenerife.

by Admin
July 18, 2025
0

The international electronic music brand, one of the most prestigious in the world, will debut on the...

Can La Palma Have Its First Geothermal Power Station? Here Are the Areas Being Investigated

Can La Palma Have Its First Geothermal Power Station? Here Are the Areas Being Investigated

July 18, 2025
The Majorero Donkey Endures the Heat to Succeed in Aguere

The Majorero Donkey Endures the Heat to Succeed in Aguere

July 18, 2025
Our Lady of Mount Carmel (and III)

Our Lady of Mount Carmel (and III)

July 18, 2025
The tram strike committee resumes negotiations with Metropolitano de Tenerife.

The tram strike committee resumes negotiations with Metropolitano de Tenerife.

July 18, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Guide
  • Adobe
  • Linkedin
  • Privacy Policy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly