Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home El Dia

The PP affirms that the work on the Jama road does not solve its deficits

January 12, 2022
in El Dia
Reading Time: 3 mins read
0
The PP affirms that the work on the Jama road does not solve its deficits
3
SHARES
Share on FacebookShare on Twitter



The PP affirms that the work on the Jama road does not solve its deficits

The work for the rehabilitation of the highway that connects Jama (San Miguel de Abona) and Buzanada (Vilaflor) “does not solve the problem” of the TF-655 “definitively”. The island councilor, Valentín González (PP), explains that, “despite the fact that an integral action was announced from Carreteras, the truth is that in some sections the resurfacing has only been carried out (without proceeding to mill the pavement) and, in others , not even that”. The Popular Party at Council repeatedly claimed “A comprehensive action on this road” because “The deterioration in which it was found seriously affected the safety of users.”

For González Évora, the head of Roads in the Cabildo, Enrique Arriaga, “He was not faithful to the truth when he announced with great fanfare a comprehensive performance”. In fact, he publicly assured that he would proceed to “prior milling of the road, the removal of the previous asphalt and the replacement of the firm on the entire road.” The sanmiguelero adviser of the PP is clear that this announcement “does not correspond to the reality of the work that was executed, as can be seen in the images that the Cabildo made public, in which it is clearly seen how the machines proceed the resurfacing of some sections, without removing the pre-existing pavement (milling), which is the way to guarantee that the serious deterioration suffered by this road is not reproduced and that has significantly affected traffic safety in the zone”.

Taking into account that the works had a budget of more than 1.5 million euros, “we would have expected diligent action” and predicts an accelerated deterioration due to the fact that it registers a high level of heavy traffic and the fact that ” It is one of the main accesses to the Teide National Park, ”says Valentín González.

Who was also mayor of San Miguel de Abona is concerned about the result of this work. “In the Popular Party we believe that it is unfortunate that the Cabildo offers headlines that do not attend to the reality of the projects, since this constitutes a fraud against citizens, who are those truly affected by the actions of public administrations.”

An error of the PP

The insular counselor for Roads, Enrique Arriaga, points out that the rehabilitation work of the TF-565 between Jama and La Escalona is 50% complete. “After 30 years without intervening, the entire road surface is being laid,” he recalls. “Currently, we are in the phase of completing the execution of the intermediate layer to later finish with the tread layer,” explains the vice president of the Cabildo. It reports that “in parallel work is being done on improving protection barriers and on the construction of ditches.” Likewise, it defends that “the works are going at a good pace” and that the initial planning is fulfilled.

Arriaga values ​​that, “on the part of the Popular Party, it is a mistake to try to find a headline without having knowledge of what is being done and without waiting for the performance to be finished.” The island councilor responsible for Roads perceives “contempt for the work carried out by the engineers in charge of the work, who are the ones who decide what actions should be carried out at each point of the road, depending on the requirements and technical possibilities.”



Source link

Related Posts

The Magician’s Dance Brings Together 12,000 People Around 700 Tables
El Dia

The Magician’s Dance Brings Together 12,000 People Around 700 Tables

July 12, 2025
SAN FERMINES TENERIFE | A neighbourhood in Tenerife kicks off the ‘txupinazo’ and celebrates its own bull run for San Fermín
El Dia

SAN FERMINES TENERIFE | A neighbourhood in Tenerife kicks off the ‘txupinazo’ and celebrates its own bull run for San Fermín

July 11, 2025
Fepeco and Güímar Explore Solutions for Public Housing
El Dia

Fepeco and Güímar Explore Solutions for Public Housing

July 11, 2025
No Result
View All Result

Click Image to Join Community

Tenerife Forum Community

Previous News

Puerto de la Cruz kicks off its ‘Eurocarnaval’

Puerto de la Cruz kicks off its ‘Eurocarnaval’

1 year ago
GÜÍMAR INDUSTRIAL ESTATE RENOVATION | €5 million allocated to revitalise the Güímar Industrial Estate after 20 years of neglect: here’s what will be improved

GÜÍMAR INDUSTRIAL ESTATE RENOVATION | €5 million allocated to revitalise the Güímar Industrial Estate after 20 years of neglect: here’s what will be improved

1 year ago
Borrasca Nuria Triggers Red Alert for Canary Islands: A Lasting Concern

Borrasca Nuria Triggers Red Alert for Canary Islands: A Lasting Concern

3 months ago
Tenerife’s Future: The Culinary Capital of the Canary Islands

Tenerife’s Future: The Culinary Capital of the Canary Islands

11 months ago
La Tahonilla uses a therapeutic laser in the rehabilitation of sea turtles

La Tahonilla uses a therapeutic laser in the rehabilitation of sea turtles

3 years ago
The Royal Family Sends Condolences for Pastor Nicomedes’ Passing

The Royal Family Sends Condolences for Pastor Nicomedes’ Passing

11 months ago
No Result
View All Result

News Highlights

A Estate, a Saint, and a Pilgrimage (Part III). By Julio Torres Santos

No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife

A union denounces the alteration of customs officers’ shifts as malpractice.

The Convent of Santo Domingo Opens Its Doors to the ‘Spaces of the Canaries’

The Mediator Judge will send the solar panel case to the Court for a Jury.

A man in critical condition after being revived from a cardiac arrest in Candelaria.

Trending News

Canaries loses its traditional pubs
Atlantico

Canaries loses its traditional pubs

by Admin
July 12, 2025
0

Costly burdens, a lack of generational succession and transformations in social habits are driving traditional bars in...

The Cabildo to Provide Work Placements for 450 ULL Students in the 2025-2026 Academic Year

The Cabildo to Provide Work Placements for 450 ULL Students in the 2025-2026 Academic Year

July 12, 2025
The Magician’s Dance Brings Together 12,000 People Around 700 Tables

The Magician’s Dance Brings Together 12,000 People Around 700 Tables

July 12, 2025
A Estate, a Saint, and a Pilgrimage (Part III). By Julio Torres Santos

A Estate, a Saint, and a Pilgrimage (Part III). By Julio Torres Santos

July 12, 2025
No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife

No Water Given to Victims of Domestic Violence at the Courts of Santa Cruz de Tenerife

July 11, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Guide
  • Adobe
  • Linkedin
  • Privacy Policy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly