Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home Atlantico

Cabildo backs Santa Cruz with half a million euros to demolish the Añaza monstrosity.

July 16, 2025
in Atlantico
Reading Time: 2 mins read
0
Cabildo backs Santa Cruz with half a million euros to demolish the Añaza monstrosity.
6
SHARES
Share on FacebookShare on Twitter




Cabildo backs Santa Cruz with half a million euros to demolish the Añaza monstrosity.

The Cabildo of Tenerife has approved a grant of 500,000 euros to the Santa Cruz de Tenerife City Council to facilitate the expropriation of the land where the abandoned Añaza building, more commonly known as the Añaza mammoth, stands.

This step is “essential” for advancing its demolition and for the landscape recovery of the coastal environment, according to the island institution.

The action has a total funding of three million euros, complemented by the 2.5 million euros granted by the Government of the Canary Islands.

As highlighted by the President of the Cabildo, Rosa Dávila, this institutional collaboration will “unlock a long-awaited project for the neighbourhood” and serves as an example of how to “continue to open Santa Cruz to the sea and return coastal spaces to its residents.”

The building is considered the ugliest on the Canary coast due to its large dimensions and the increasing state of deterioration after nearly 50 years of abandonment.

It was designed in 1973 as a luxury hotel with 741 apartments spread over 22 floors, but construction was halted in 1975 due to urban irregularities, financial problems, and the lack of final permits.

Since then, the structure, which occupies between 35,000 and 40,000 square metres, has remained abandoned and has become a disjointed mass that disrupts the coastal landscape and poses a safety risk.

In January, the Government of the Canary Islands and the Santa Cruz City Council took a step forward to end the construction: with the 2.5 million euros from the Ministry of Ecological Transition and Energy, the council committed to demolition within a period of 36 months and to undertake the renaturalisation of the space it occupies and its surroundings.

The Santa Cruz City Council aims to complete the expropriation throughout 2025 and subsequently put the demolition out to tender. It is estimated that the recovery of this stretch of coastline could be completed between 2027 and early 2028.

The project includes not only the demolition of the building but also the ecological regeneration of the area, the creation of green spaces, areas for walking and community interaction, and the construction of a maritime platform known as La Mareta, which will establish a safe swimming area.

Additionally, it includes the connection with the future coastal promenade, the protection of the archaeological heritage in the area, and its integration into the municipality’s sustainable mobility systems.

“What we want to do is to return access to the sea for the residents and transform an abandoned area into a natural, cared-for, and safe place,” emphasised the President of the Cabildo.

“It is about returning to Añaza a space that belongs to its people, a part of the coastline that should never have been lost and that can be lived in, enjoyed, and looked after by its residents,” concluded Dávila.

Related Posts

The Canary Sports Observatory: Rigorous and Accessible Data for Informed Decision-Making
Atlantico

The Canary Sports Observatory: Rigorous and Accessible Data for Informed Decision-Making

July 18, 2025
Can La Palma Have Its First Geothermal Power Station? Here Are the Areas Being Investigated
Atlantico

Can La Palma Have Its First Geothermal Power Station? Here Are the Areas Being Investigated

July 18, 2025
The tram strike committee resumes negotiations with Metropolitano de Tenerife.
Atlantico

The tram strike committee resumes negotiations with Metropolitano de Tenerife.

July 18, 2025

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *


No Result
View All Result

Click Image to Join Community

Tenerife Forum Community

Previous News

The Crucifixes, Key Symbol of Los Realejos and Puerto de la Cruz

The Crucifixes, Key Symbol of Los Realejos and Puerto de la Cruz

1 year ago
They save the life of a young man on a bridge on the South highway as it passes through Caletillas

They save the life of a young man on a bridge on the South highway as it passes through Caletillas

2 years ago
An elderly man moderately injured after being run over in Puerto de la Cruz (Tenerife)

An elderly man moderately injured after being run over in Puerto de la Cruz (Tenerife)

3 years ago
CC promises that it will take the autochthonous games to the schools of the Island

CC promises that it will take the autochthonous games to the schools of the Island

2 years ago
Second Prize of the Children’s Lottery sold in Gran Canaria, Lanzarote and Tenerife

Second Prize of the Children’s Lottery sold in Gran Canaria, Lanzarote and Tenerife

3 years ago
The light returns to Ten-Bel after the urgent installation of generators

The light returns to Ten-Bel after the urgent installation of generators

4 years ago
No Result
View All Result

News Highlights

The Majorero Donkey Endures the Heat to Succeed in Aguere

Our Lady of Mount Carmel (and III)

The tram strike committee resumes negotiations with Metropolitano de Tenerife.

Sardà and Valdano Reflect on Maturity in a CaixaBank Discussion in Tenerife

The Leal Theatre presents a musical journey for all audiences this weekend.

Unions announce new meetings to resolve the employment dispute at the Tenerife Metropolitano.

Trending News

The Canary Sports Observatory: Rigorous and Accessible Data for Informed Decision-Making
Atlantico

The Canary Sports Observatory: Rigorous and Accessible Data for Informed Decision-Making

by Admin
July 18, 2025
0

Sport management in the Canary Islands is gearing up for a significant leap. This is not just...

The giant Zamna reveals its lineup of artists for the upcoming launch in Tenerife.

The giant Zamna reveals its lineup of artists for the upcoming launch in Tenerife.

July 18, 2025
Can La Palma Have Its First Geothermal Power Station? Here Are the Areas Being Investigated

Can La Palma Have Its First Geothermal Power Station? Here Are the Areas Being Investigated

July 18, 2025
The Majorero Donkey Endures the Heat to Succeed in Aguere

The Majorero Donkey Endures the Heat to Succeed in Aguere

July 18, 2025
Our Lady of Mount Carmel (and III)

Our Lady of Mount Carmel (and III)

July 18, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Guide
  • Adobe
  • Linkedin
  • Privacy Policy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly