Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home El Dia

TENERIFE TRANSPORTATION | Tenerife explores a train-tram for the North connecting La Laguna and Tacoronte

June 21, 2024
in El Dia
Reading Time: 5 mins read
0
TENERIFE TRANSPORTATION | Tenerife explores a train-tram for the North connecting La Laguna and Tacoronte
3
SHARES
Share on FacebookShare on Twitter

A conventional suburban train between San Isidro (Granadilla de Abona) and Adeje, and a train-tram between La Laguna and Tacoronte passing through Los Rodeos airport. This is the plan being considered by the Tenerife Island Council for the initial sections of the South and North railway lines. Rosa Dávila, president of the island’s Corporation, revealed yesterday that this is the idea being worked on by the technicians. The Council is working at full speed to resolve the planning and expedite the process once the Canary Islands Government progresses in discussions with the national government to implement the railway projects of Tenerife into the national network.

Rosa Dávila (CC) considers it “vital” that the projects of the Southern and Northern trains, which she strongly supports, are incorporated into the national railway system to become a reality. “It would allow us to access state funding, but above all European funding, through the Connect Europe funds, with billions of euros for decarbonisation that could even cover 70% of the cost of the Tenerife lines,” stated the president of Tenerife yesterday.

The Cabildo proposes as the first section to be developed of the Tenerife railway network that from San Isidro de Granadilla to Costa Adeje of the South line.  It would be a conventional commuter train, with stations at various points such as Los Cristianos (photomontage on the left) and Adeje (photomontage on the right) |  ed

The Cabildo proposes as the first section to be developed of the Tenerife railway network that from San Isidro de Granadilla to Costa Adeje of the South line. It would be a standard commuter train, with stops at various points such as Los Cristianos (photomontage on the left) and Adeje (photomontage on the right) | ed / Daniel Millet

Due to the high costs involved, the Canarian Government, in coordination with the Tenerife Island Council, is considering developing them in sections to start as soon as possible. The Tenerife Sustainable Mobility Plan includes an island rail ring that incorporates, in addition to the South and North lines, the West line – connecting Icod de los Vinos and Adeje – as well as an underground line between Güímar and La Orotava. The total cost exceeds 5.735 billion Euros.

The Canarian Government and the Tenerife Council prefer to divide the South and North lines to make them viable. The first action that would be considered is the section from San Isidro de Granadilla to Costa Adeje, to then complete the line from the South to Santa Cruz. “It should be noted that just this section, including the stations and depots, would cost around 800 million Euros,” clarifies Rosa Dávila. It would be a standard train like the commuter trains, passing through various points, including Reina Sofía airport.

Tenerife studies a train-tram for the North between La Laguna and Tacoronte

Tenerife explores a train-tram for the North connecting La Laguna and Tacoronte / Daniel Millet

Next, the first section of the North train would be tackled. “We are considering, as the most viable option, a train-tram between La Laguna and Tenerife North Airport in Ciudad de La Laguna, which would then be extended to Tacoronte and continue to La Orotava, instead of a tram from La Laguna to the airport, in addition to a standard train like the one in the South. Technicians are working to determine the feasibility of this alternative, which would have less impact, lower cost, high effectiveness, and would run parallel to the North motorway,” explains the President of the Tenerife Island Council, highlighting that both sections “would attract a large number of passengers, reducing many vehicles from the highways and roads.”

Advantages of versatility

The proposed system for the North, at least for that first section La Laguna-Tacoronte, would also bring “significant advantages due to its versatility.” The train-tram – also known as a tram-train – is a vehicle derived from the tram capable of running on multiple routes. Its dual voltage capacity allows it to access railway and tram infrastructures, it can operate within railway standards, and switch to tram mode when entering the city.

These statements from Rosa Dávila come after the regional government announced that the first section of the Tenerife trains “can begin construction before 2027.” This was stated on Wednesday by the Minister of Public Works and Mobility, Pablo Rodríguez, before presenting, along with the Directors General of Transport and Road Infrastructure, María Fernández and Rosana Melián, the sustainable roadmap defined by this department with the goal of decarbonizing the Archipelago by 2040.

Rosa Dávila lamented “the time lost” by the previous regional and island governments led by the PSOE. “The previous governments shelved the projects, and now new teams have reactivated them,” said Dávila, concluding, “I am optimistic. I have seen a very positive disposition in the central government to include these plans in the national railway system.”

Subscribe to continue reading

Related Posts

The South of Tenerife Celebrates the Expansion of Its Hospital
El Dia

The South of Tenerife Celebrates the Expansion of Its Hospital

July 18, 2025
The Majorero Donkey Endures the Heat to Succeed in Aguere
El Dia

The Majorero Donkey Endures the Heat to Succeed in Aguere

July 18, 2025
PSOE TENERIFE | PSOE proposes declaring an emergency due to ineffectiveness in the Cabildo of Tenerife and opposes the forestry penny.
El Dia

PSOE TENERIFE | PSOE proposes declaring an emergency due to ineffectiveness in the Cabildo of Tenerife and opposes the forestry penny.

July 17, 2025
No Result
View All Result

Click Image to Join Community

Tenerife Forum Community

Previous News

Tenerife’s Cabildo Closes Chío as Icy Roads Block Access to Teide National Park

Tenerife’s Cabildo Closes Chío as Icy Roads Block Access to Teide National Park

5 months ago
La Matanza will have a skate park of almost 1,200 square meters

La Matanza will have a skate park of almost 1,200 square meters

3 years ago
Municipal Water Debt Slashed to Approximately  Million

Municipal Water Debt Slashed to Approximately $13 Million

10 months ago
Canary Islands Unveils Innovative Travel Initiative for Travelers Aged 55 and Up

Canary Islands Unveils Innovative Travel Initiative for Travelers Aged 55 and Up

11 months ago
The Cabildo promotes a project to serve the Ukrainian families who arrived on the Island

The Cabildo promotes a project to serve the Ukrainian families who arrived on the Island

3 years ago
UPCC, satisfied with the conviction of Guillermo García for irregularities at the head of RTVC

UPCC, satisfied with the conviction of Guillermo García for irregularities at the head of RTVC

3 years ago
No Result
View All Result

News Highlights

Iberia complicates Gran Combo de Puerto Rico’s concert in Tenerife by losing their instruments.

Surf’s Up: Discovering the Waves of El Médano, Tenerife

The Tejina Hearts Association Keeps Entries Open for the Poetry and Verse Competition

Neither haze nor storm: the meteorological phenomenon that only occurs in the Canaries and is misunderstood in Spain.

The South of Tenerife Celebrates the Expansion of Its Hospital

Jennifer Lopez and Gloria Estefan choose to stay at the Botanic Hotel & The Oriental Spa Garden

Trending News

ASEPALMA calls on CC to urge the Canary Government to advance the funds owed by the State for agricultural reconstruction following the volcano.
La Laguna

ASEPALMA calls on CC to urge the Canary Government to advance the funds owed by the State for agricultural reconstruction following the volcano.

by Admin
July 19, 2025
0

The Association of Packing, Exporting and Marketing Entities of La Palma has made this request after securing...

Closure due to Playa Jardín’s discharges results in just a £400 fine.

Closure due to Playa Jardín’s discharges results in just a £400 fine.

July 18, 2025
Moisés Afonso León heads the new Executive Committee of Young Nationalists of La Laguna.

Moisés Afonso León heads the new Executive Committee of Young Nationalists of La Laguna.

July 18, 2025
Iberia complicates Gran Combo de Puerto Rico’s concert in Tenerife by losing their instruments.

Iberia complicates Gran Combo de Puerto Rico’s concert in Tenerife by losing their instruments.

July 18, 2025
Surf’s Up: Discovering the Waves of El Médano, Tenerife

Surf’s Up: Discovering the Waves of El Médano, Tenerife

July 18, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Guide
  • Adobe
  • Linkedin
  • Privacy Policy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly