The works of the Padre Anchieta pedestrian walkway in the municipality of La Laguna will force the cut of the TF-5 at kilometer point 9+275, as well as the link, as of tomorrow, the Cabildo de Tenerife has reported in a note press, administration that executes the works.
In the same way, the TF-24 (La Esperanza road) will be affected with the partial occupation of the right lane and the closure of the left lane from kilometer point 0+000 to kilometer point 1+000 of the aforementioned road.
As alternative routes, traffic will be diverted in the direction of the Padre Anchieta junction in the direction of the Padre Anchieta roundabout on the TF-265 and in the direction of Santa Cruz with a new direct access branch from the TF-24 to TF-5.
The cuts will be made from 7:00 a.m. to 6:00 p.m. and according to the Cabildo, the works will last two days starting on Tuesday, August 1, and ending on Wednesday, August 2.
Likewise, the Cabildo de Tenerife will carry out improvement work to guarantee adequate lighting at kilometer point 6+200 of the TF-1 in the south direction. The work to be carried out will consist of crossing lighting pipes, which will provide better visibility of the area at night.
For the work, three lanes of the four existing on the TF-1, kilometer point 6+200 southbound, will be cut, making way for the free lane, on Tuesday, August 1 and Wednesday, August 2.
On Thursday, August 3, the right road will be completely cut off in the south through the bypasses located at kilometer points 5+920 and 8+200, making it necessary to drive on the left road and exit 7 of El Rosario, La Campana, will be affected. El Chorrillo and Radazul.
Vehicles that want to access these destinations must do so by making a U-turn on the Tabaiba link.