The works in the TF-4 highwayone of the inputs and departures from Santa Cruz de Tenerifecauses long queues at this time of afternoon.
He Council of Tenerife reported that improvements in TF-4 highway they would begin last Friday, July 28, lasting, in principle, for two weeks.
In the Santa Cruz direction, the left lane will be cut from kilometer point 2,200 to 1,700, which becomes a reversible lane where southbound traffic will circulate. Vehicles will circulate only in the right lane.
In the south direction, the two traffic lanes will be completely cut off, from Avenida de la Constitución (kilometer point 1,500 of the TF-4), diverting traffic through the roundabout of the fairgrounds and through the left lane of the road in the direction Santa Cruz, which is enabled to allow circulation in the opposite direction than usual.
From the 2,400 kilometer point, the vehicles will return to their road, ending the detour and driving normally.