Tenerife Weekly News
  • Home
  • El Diario
  • Diario de Avisos
  • El Dia
  • La Provincia
  • Europa Press
  • Press Releases
  • Blog
  • Contact
No Result
View All Result
  • Home
  • El Diario
  • Diario de Avisos
  • El Dia
  • La Provincia
  • Europa Press
  • Press Releases
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly News
No Result
View All Result
Home Europa Press

The Government declares the new Puerto Naos-Tazacorte highway an emergency with an investment of 38 million

March 22, 2022
in Europa Press
Reading Time: 3 mins read
0
3
SHARES
Share on FacebookShare on Twitter



SANTA CRUZ DE TENERIFE, March 22. (EUROPE PRESS) –

The Ministry of Transport, Mobility and Urban Agenda (Mitma) will address the new road of about 5.5 kilometers in length between Puerto Naos and Tazacorte through an emergency declaration, which will allow reestablishing the road connection on the western slope of the island of La Palma , affected by the volcanic eruption of 2021.

This new road will cross the volcanic flows expelled by the volcano and specifically, the provisional restitution of the LP-213 road is being carried out.

Additionally, it is planned to condition a section of road not affected by the volcano between Tazacorte and Los Llanos de Aridane to connect the nodes of the current road network that allow absorbing and distributing the traffic that now moves to the western fringe of the affected area. , and thus the functionality of the emergency work is complete.

This action has been agreed within the framework of the working group established by the General Directorate of Roads of the Ministry, the General Directorate of Road Infrastructures of the Government of the Canary Islands, the Cabildo, the affected town councils and the Government Delegation in the Canary Islands itself.

The investment is estimated at around 38 million euros, which includes approximately 9.3 million euros planned for expropriations, the Ministry details in a note.

Since the volcanic eruption of Cumbre Vieja, highways LP-2, LP-212, LP-213, LP-211, LP-2132 and LP215 have been partially buried by the lava flow, which has an estimated average thickness of 12 meters and thicknesses maximum up to 70 meters.

Therefore, North-South communication in this area of ​​the island has been completely interrupted by its western slope, isolating population centers and farms from the municipalities of Los Llanos de Aridane, Tazacorte and El Paso.

The objective of the emergency work is to restore, as far as possible, the connection between the LP-2 highway in the core of Los Llanos de Aridane with the southeast area of ​​La Colada, thus reestablishing the main mobility itinerary affected.

In accordance with the information available and the conditions of the flow, it has been decided, in coordination with the regional and local administrations, to execute the new infrastructure in the area closest to the coastal strip, to the west of the mountains of La Laguna and Todoque, where the casting thicknesses are smaller and the surface condition is less.

MORE THAN 8 KILOMETERS

The action will have a total of about 8.5 kilometers in length, of which 5.5 kilometers correspond to a new route.

The first section of the new road consists of about 4.5 kilometers with the beginning located on the LP-213 road, before the descent to Puerto Naos and at the intersection with the Hoyo del Verdugo road (which has been prepared in an emergency by the Ministry of Public Works of the Government of the Canary Islands in January 2022, until its connection with the LP-2).

The section ends at the intersection of the current LP-2132 coastal road with the LP-215, to the northwest of the La Laguna mountain and about 1,000 meters from Tazacorte. This section saves the area directly occupied by the lava flow.

The planned action includes the construction of a two-way road, with two three-meter lanes, a 1.5-meter shoulder on both sides and a three-meter berm on each side reserved as a service corridor.

The second section, one kilometer long, runs from the intersection of the current LP-2132 coastal road with the LP-215 to the entrance roundabout to Tazacorte.

The current coastal road and the agricultural roads in this area do not have the capacity to absorb the traffic of the new road, so it is necessary to build a connection with the entrance roundabout to Tazacorte.

The third section, three kilometers long, involves refurbishing the current LP-2 highway, from the entrance roundabout to Tazacorte to the intersection between the LP-1, the LP-2 and the Los Llanos de Aridane ring road (LP- twenty-one).

In this way, the Northwest-Southeast mobility of the main road LP-2 is fully restored.



Source link

Related Posts

Europa Press

Enrique Arriaga is running as a Cs candidate for the Mayor of Santa Cruz de Tenerife

February 2, 2023
Europa Press

Freedom, with a ban on leaving Tenerife, for the defendant for an alleged sexual assault in Arona

February 2, 2023
Europa Press

Five people are injured after a brawl in the ring zone of La Laguna (Tenerife)

February 2, 2023
No Result
View All Result

Click Image to Join Community

Tenerife Forum Community

Recommended News

The PSOE assures that there are a hundred public properties without legalizing in San Miguel

5 months ago

The term for authorizations to collect pine needles from the pine forests of Adejeros is open

12 months ago

Lava continues to flow into the lava delta without causing further damage

1 year ago

The General Council of Social Services approves the draft of the Canary Islands citizen income

1 year ago

Dreamy Easter for tourism

10 months ago

The Cabildo draws up a project to alleviate traffic in San Isidro

3 months ago
No Result
View All Result

News Highlights

«My grandmother, who was queen of the elderly in 2015, advises me to smile when I go out at the gala»

Third Phase of the Adult Murgas Contest of the Santa Cruz Carnival

RESTAURANT CANARY ISLANDS viral | The most surreal robbery: he tries to loot a tobacco machine and gets caught

“The devil is constantly tempting us”

The rupture of a pipe, cause of the sinkhole in La Marina street, in Santa Cruz

Enrique Arriaga is running as a Cs candidate for the Mayor of Santa Cruz de Tenerife

Trending News

Diario de Avisos

Candelaria recovers, after two years, normality at the patron saint’s party

by Admin
February 3, 2023
0

After two years where the onomastics of the Virgin of Candelaria (February 2) had to be held...

CC demands a solution from the Government for the Emergencies of Realejo

February 3, 2023

Bambones, 40 years taking care of letters

February 3, 2023

«My grandmother, who was queen of the elderly in 2015, advises me to smile when I go out at the gala»

February 2, 2023

Third Phase of the Adult Murgas Contest of the Santa Cruz Carnival

February 2, 2023
Tenerife Weekly News

© 2022 Tenerife Weekly

Navigate Site

  • Privacy Policy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • El Diario
  • Diario de Avisos
  • El Dia
  • La Provincia
  • Europa Press
  • Press Releases
  • Blog
  • Contact

© 2022 Tenerife Weekly

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.