The first vice president and insular counselor of Roads, Enrique Arriaga (Citizens), points out that during the four months they will proceed to arerect the firm on the six and a half kilometers of the route of this road. Likewise, the project contemplates working on the ditches and improving the existing fencing. Arriaga indicates that “resurfacing requires an investment of 1,571,070 euros and will mean an improvement in driving safety and comfort conditions.”
The works that will start in five days They contemplate previous milling operations, the removal of the current asphalt and the replacement of pavements throughout the road; in addition, containment systems will be replenished. The insular director of Roads, Tomás Félix García, points out that at the moment the TF-565 «presents almost entirely abundant potholes and sinkholes, as well as a progressive deterioration as a result of heavy traffic and the increase in the number of vehicles that pass through it. via”. It is a highly traveled road, since it is one of the accesses to the Teide National Park. García points out that “the rehabilitation will avoid, in the medium and long term, the increase in costs in conservation and maintenance activities.”
For safety reasons for both workers and users of the Jama-La Escalona highway, the Cabildo announces that specific lane cuts, with alternative traffic, during the development of the works.