Tenerife Weekly News
  • Home
  • El Diario
  • Diario de Avisos
  • El Dia
  • La Provincia
  • Europa Press
  • Press Releases
    • Submit Press Release
  • Blog
    • Write For Us
  • Contact
No Result
View All Result
  • Home
  • El Diario
  • Diario de Avisos
  • El Dia
  • La Provincia
  • Europa Press
  • Press Releases
    • Submit Press Release
  • Blog
    • Write For Us
  • Contact
No Result
View All Result
Tenerife Weekly News
No Result
View All Result
Home El Dia

The Cabildo de Tenerife urgently repairs a damaged wall on the Punta de Teno road

October 15, 2021
in El Dia
Reading Time: 2 mins read
0
2
SHARES
Share on FacebookShare on Twitter



The insular vice president and counselor of Roads, Enrique Arriaga (Cs), explains that «It is an emergency work to prevent more debris from falling onto the road, after the continuous episodes of landslides detected in the area have accumulated gravel and large rocks behind the wall that could arrive on the road ”.

«The action consists of the removal of the detached material and the repair and expansion of the retaining wall. The works will be carried out during the daytime and it is necessary to establish specific cuts in traffic that will be signaled, ”announces Arriaga. The insular director of Roads, Tomás Félix García, adds that this action «joins other works that the area also carries out on this access road to the Teno lighthouse, such as the repair and cleaning of the retention meshes installed on the left side of the road. The operators, specialists in vertical work, are removing stones from the meshes and replacing some anchor cables that had deteriorated.

These works to improve the landslide retention system began on September 27 on the island highway TF-445. The area in which the works are carried out is between kilometer points 4,150 and 5,400, which are the most affected by rock falls from high cliffs.

Arriaga has also explained that “it is an urgent action that will allow the installation of new triple twist meshes to restore security on this island road. The current retention system of the slope is compromised due to the frequent landslides that occur in the area, sometimes with large rocks ”. This action will also force to establish “specific cuts to be able to work safely and at times when it is considered that there is a risk of detachment”. These works have an execution period of three months.



Source link

Related Posts

El Dia

The most expensive and cheapest time to put the washing machine this Monday in the province of Santa Cruz de Tenerife

May 16, 2022
El Dia

Arguayo celebrated its traditional pilgrimage in honor of San Isidro Labrador

May 16, 2022
El Dia

Santiago del Teide chose its new Child, Senior and Adult Romeras

May 16, 2022

Recommended

The Porto City Council will adapt the existing uses in seven areas of the city

2 months ago

The lack of customs controls at the two airports diverts the merchandise to Gando

6 months ago

The mayor of Santa Cruz de Tenerife asks to eliminate capacity and schedule restrictions on the islands in alert level 1 for COVID

7 months ago

Torres assures that the Canary Islands will no longer be “red lantern” this year in Dependency

3 weeks ago

Julio Nieto, sculptor: “My profession is worth it just for living these moments”

5 months ago

The Canary Islands registers a warm and sunny month of August and with the first heat wave since 2015

8 months ago

Categories

  • Blog
  • Diario de Avisos
  • El Dia
  • El Diario
  • Europa Press
  • La Provincia
No Result
View All Result

Highlights

The most expensive and cheapest time to put the washing machine this Monday in the province of Santa Cruz de Tenerife

They withdraw 100 electric scooters in Arona for obstructing its streets

The Cabildo de Tenerife will review the reports of the Puertito de Adeje project and will intervene if it does not comply with the law

Arguayo celebrated its traditional pilgrimage in honor of San Isidro Labrador

The Cabildo urges Santa Cruz to rehabilitate the firm of the bus lane

Rakuten TV shoots an adventure reality show in the Canary Islands presented by Pilar Rubio

Trending

Diario de Avisos

The Queen’s Gala will use the innovative CuePilot production system

by Admin
May 16, 2022
0

The Gala for the election of the Carnival Queen It will be carried out this year with...

The new Cooperation Plan of the Cabildo de Tenerife increases to 60 million

May 16, 2022

The Cabildo de Tenerife announces that it will review the reports of the hotel project in Puertito de Adeje

May 16, 2022

The most expensive and cheapest time to put the washing machine this Monday in the province of Santa Cruz de Tenerife

May 16, 2022

They withdraw 100 electric scooters in Arona for obstructing its streets

May 16, 2022
Tenerife Weekly News

© 2021 Tenerife Weekly

Navigate Site

  • Privacy Policy
  • Write For Us
  • Submit Press Release
  • External Links
  • Contact

Follow Us

No Result
View All Result
  • Home
  • El Diario
  • Diario de Avisos
  • El Dia
  • La Provincia
  • Europa Press
  • Contact

© 2021 Tenerife Weekly

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.