Monday, September 15, 2025
Tenerife Weekly
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact
No Result
View All Result
Tenerife Weekly
No Result
View All Result
Home El Dia

The mayor of Güímar paralyzes the works of the Las Bajas slope due to its high cost overrun

September 2, 2021
in El Dia
Reading Time: 3 mins read
0
The mayor of Güímar paralyzes the works of the Las Bajas slope due to its high cost overrun
4
SHARES
Share on FacebookShare on Twitter


Partial view of Las Bajas and the slope.

Partial view of Las Bajas and the slope.
Delia Padrón

The works to secure the Las Bajas slope, in Güímar, andThey are temporarily paralyzed by decree of the mayor, Gustavo Pérez. The cause is the excess of the amount of the work certifications presented by the company to the City Council, which increases the cost of its execution by around one million euros compared to the budget for which these works were contracted.

Today there will be a meeting between the parties involved, as well as with municipal urban and legal technicians, departments that will have to issue reports on the matter. One of the purposes is to determine if the action that is carried out maintains the character of emergency in its entirety or if it is necessary to exclude any part for its bidding, something must be resolved by the technical referrals of the Administration.

The works are carried out on the slope of the sea margin of the tunnel that is located on the South highway as it passes through Güímar. The municipal investment planned to repair this space amounted to 342,865 euros. The contracted works consist of placing dynamic barriers, triple torsion meshes and shotcrete or shotcrete to reinforce the slope. This is to solve the problems that affect this wall, which presents an imminent risk of high danger from atmospheric phenomena, as well as a high risk of detachment. This is determined by the technical report commissioned by the municipal government and received on February 15 last. Both circumstances pose a threat to the integrity of the homes and the people of Las Bajas.

Is about a small town made up of a score of houses, caves and house-caves (something similar to Bajo la Cuesta, in Candelaria) of which only eight were permanently inhabited. These eight families, which number around 20 people (including minors), were rehoused by the Güimarero City Council, which assumes the cost of accommodation for the duration of the work contemplated to ensure the condition of the tunnel slope. That period was scheduled to be four months, that is, until this September.

This nucleus was created next to the sea and, as in many other points on the southern coast of the Island, it arose with the occupation of the caves that are in the place, later converted into houses with new annexed construction. The profile of the eight families that live in the town every day is that of employed workers, some of them are older and there are also several minors.

Likewise, it is one of the nuclei of the Güimarero coastline affected by a file for the recovery of possession of the space in the maritime-terrestrial public domain, promoted by the General Directorate of the Costa el Mar. Fact already communicated to the neighbors.



Source link

Related Posts

The Three Defendants Stabbed and Brutally Assaulted the Victim
El Dia

The Three Defendants Stabbed and Brutally Assaulted the Victim

September 15, 2025
Water Crisis in Tenerife: Demand Surges as Reserves Dwindle
El Dia

Water Crisis in Tenerife: Demand Surges as Reserves Dwindle

September 15, 2025
Canary Names: The “Small Cove” That Inspired One of Tenerife’s Most Touristic Areas
El Dia

Canary Names: The “Small Cove” That Inspired One of Tenerife’s Most Touristic Areas

September 14, 2025
No Result
View All Result

Latest Blog Articles

  • Blog
Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

Tenerife’s Ocean Giants: Unforgettable Whale Watching Experiences

11 hours ago
El Médano: A Hidden Gem for Windsurfing Enthusiasts

El Médano: A Hidden Gem for Windsurfing Enthusiasts

3 days ago
Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

Protected: Tenerife Femenino Breaks Records as 22,000 Fans Pack Stadium in Historic Night for Women’s Football

4 days ago
Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

Protected: Why Solo Travellers Are Absolutely Obsessed with Tenerife (And You Will Be Too)

4 days ago
Sun, Sand, and Serenity: Your Guide to Los Cristianos Beach

Sun, Sand, and Serenity: Your Guide to Los Cristianos Beach

6 days ago
Tenerife’s Hidden Gems: The Enchantment of Black Sand Beaches

Tenerife’s Hidden Gems: The Enchantment of Black Sand Beaches

1 week ago
No Result
View All Result

News Highlights

Heat Returns: Temperatures Set to Reach 34°C This Tuesday in the Canary Islands

A Man Dies After Being Evacuated to Tenerife Following Arrival in El Hierro by Small Boat

La Laguna Kicks Off the School Year with Over 1,800 Enrolled in Extracurricular Activities and Early Reception

Antonio Morales: “Gran Canaria Will Not Host the Vuelta a España if the Israeli Team Participates”

Binter Expands Flight Network to the Mainland: Explore All Connections

The La Laguna Market: Summer Recipes and Festivities Featuring Yellow Rice

Trending News

Tenerife Cabildo Bans Open Fires in Forests and Advises Against Using Trails
Atlantico

Tenerife Cabildo Bans Open Fires in Forests and Advises Against Using Trails

by Admin
September 15, 2025
0

Tenerife Implements Level I Fire Prevention Measures Fire Prevention Measures The Cabildo of Tenerife will implement Level...

Drago Gran Canaria on the Eviction of a Family with Six Minors: “Effective Measures Against Homelessness Are Not Being Implemented”

Drago Gran Canaria on the Eviction of a Family with Six Minors: “Effective Measures Against Homelessness Are Not Being Implemented”

September 15, 2025
The Three Defendants Stabbed and Brutally Assaulted the Victim

The Three Defendants Stabbed and Brutally Assaulted the Victim

September 15, 2025
Heat Returns: Temperatures Set to Reach 34°C This Tuesday in the Canary Islands

Heat Returns: Temperatures Set to Reach 34°C This Tuesday in the Canary Islands

September 15, 2025
A Man Dies After Being Evacuated to Tenerife Following Arrival in El Hierro by Small Boat

A Man Dies After Being Evacuated to Tenerife Following Arrival in El Hierro by Small Boat

September 15, 2025
Tenerife Weekly

© 2025 Tenerife Weekly

Navigate Site

  • Tenerife Forum
  • Tenerife Travel Shop
  • Ask Tenerife
  • Canarian News
  • Privacy
  • Contact

Follow Us

No Result
View All Result
  • Home
  • About
  • El Diario
  • Diario de Avisos
  • El Dia
  • Europa Press
  • La Laguna
  • El Digital Sur
  • Atlantico
  • Press Releases
  • Essentials
  • Blog
  • Contact

© 2025 Tenerife Weekly