
The Cabildo reports a break in a regenerated water pipeline for agricultural irrigation in Guaza
Balten technicians have traveled to the Guaza roundabout area (Arona), in the vicinity of the TF-1, to inspect the place and take the appropriate measures to resolve the incident as quickly as possible.
The Cabildo de Tenerife reports the breakage of a transport tube for regenerated water (already previously treated) for agricultural irrigation in the area of the Guaza roundabout, in Arona, in the vicinity of the South Highway (TF-1) which suffered a break.
The island councilor for Agriculture, Livestock and Fisheries, Javier Parrilla, who has appeared at the scene, points out that technicians from Balsas de Tenerife (Balten) have quickly traveled to inspect the land and take the appropriate measures to resolve the incident with the as quickly as possible.
Due to this break, the supply of regenerated water for agricultural irrigation has been temporarily cut off from the Adeje-Arona treatment plant and which reaches the Valle de San Lorenzo reservoir.